December 12, 2004
KST
UHF operation memorandum for the December 12 experiment
(Using Netscape
might be in trouble on this page.)
Experiment name: tau2pl
(CP2)
This SP (CP2) is made to
support a rocket launch from Andoya.@
All associations have contributed their SP times.
elan files:tau2pl-elan
(just use taul2pl series)
Pulse scheme: tau2pl
Start time: 16:00 UT
on December 12, 2004
End time: 04:00 UT on
December 13, 2004
Participants: Satonori
Nozawa, and Takuo Tsuda
Before our experiment: AAEV
After our experiment: nothing
---------------------------------------------------------------------------
Note:
(time in UT)
December
12
@@@@@ Snowing.@ Temperature is -2 deg.
@@@@@ This is the 8th day for the
Delta Campaign.@
@@@@@ At last, the sounding
rocket was launched.
16:00@ START
@@@@@ at EROS4 console (UHF)
@@@@@ runexp /kst/exp/tau2pl/tau2pl 16:00 cp2 NI
@@@@@ @(292.9 km is set automatically for tristatic measurements)
@@@@@ Tx is on (1402 kW)
16:00@ sod runexp /kst/exp/tau2pl/tau2pl 16:00 cp2 NI
@@@@@ kir runexp /kst/exp/tau2pl/tau2pl 16:00
cp2 NI
16:01@ enablerec
16:01@ sod enablerec
@@@@@ kir enablerec
16:04@ at matilda
@@@@@ cd /home/eiscat/users/yogawa
@@@@@ guisdap_delta –a
@@@@@ @@@
data path = /data/tau2pl_u_cp2_1.10HF_NI@uhf@
@@@@@ @@@
result path = /analysis/results/AUTO; 0 0 0 1 1
@@@@@ at another window
@@@@@ @ cd /home/eiscat/users/yogawa
@@@@@ @ update
&
@@@@@ http://www.eiscat.uit.no/~eiscat/yogawa/index.html
@@@@@ http://www.eiscat.uit.no/~eiscat/yogawa/index_color.html
16:06@ Tx 1419 kW
17:35@@@ snowing
@@@@@ It is also clody/snowing at Skibotn.@ It is NOT windy at Andoya
20:19@ still X=-1:30
23:27@ 1574 kW
December
13
00:21@ Decided to launch.
00:22@ gcount-downh got started
00:32:57 LAUNCH!!!!!!
02:15@ clear sky, - 6 degrees
03:34@ clear sky, - 8 degrees
04:00@ stopexp (all sites)
@@@@@ clear sky, - 10 degrees
l AAEV: Aspect angle effects in the velocity of E-region coherent echoes
l A multi-instrument campaign involving EISCAT, CUTLASS (special mode), and
STARE. The
requested time is overscheduled and cancellation will occur depending on
geophysical conditions (moderate to disturbed). The AAEV campaign is
coordinated with the CRASE experiment so that if one is cancelled then another
one will be run or vice versa. Altogether (AAEV+CRASE) 46 hours are requested
while only 34 will be used.@@@