SP-NI-PMAF (PI: Prof. Fujii (STEL)) ESR observation (SP-NI-PMAF) started at 06 UT on December 10, 2006 as scheduled. However, we lost about an hour and half due to problems with water pumps for tx5 and 6. The circuit breaker had cut out and before that was fixed a trip on the flow for the big dummy load took down all transmitters. The interlock could not be reseted with transmitters on. Needed to takedown all transmitters and bring them up again before the interlock controller was reseted. After fixed the problems, we decided to extend the run for 1 hour (until 13 UT). Summary of the ESR observation: ------------------------------------------------------------------------------- Date: December 10, 2006. Time interval: 06-13 UT Pulse code: hilde Scan pattern: lowelnorth2 (Az = 0 deg, EL = 30 deg) Tx power: 06:00 - 06:16 UT 570 kW (Reset the EROS) 06:27 - 06:40 UT 570 kW (Problems with water pumps) 07:38 - 13:00 UT 970 kW Weather condition at Longyearbyen: mostly snowing -------------------------------------------------------------------------------