% year, date, start time (HHMMSS, UT), end time (HHMMSS, UT), % Geographic latitude (120 km alt), Geographic longitude (120 km alt), % Alt of max(Sig_P) [km], Height-integrated Sig_P [S], % Altitude of max(Sig_H) [km], Height-integrated Sig_H [S], % Altitude of maximum(Ne) [km], Maximum(Ne) [log(m^(-3))] % Elevation, Azimuth, Kp, and Solar zenith angle (SZA) % Magic constant = 0.65 2009 205 100 200 78.00 16.01 119 0.276 93 0.548 93 9.824 81.6 182.1 37 117.4 2009 205 200 300 78.00 16.01 119 0.296 93 0.524 93 9.916 81.6 182.1 37 117.4 2009 205 300 400 78.00 16.01 119 0.217 93 0.359 93 9.996 81.6 182.1 37 117.4 2009 205 400 500 78.00 16.01 119 0.304 93 0.603 93 9.882 81.6 182.1 37 117.4 2009 205 500 600 78.00 16.01 113 0.187 93 0.417 93 9.818 81.6 182.1 37 117.3 2009 205 600 700 78.00 16.01 119 0.339 113 0.517 113 9.877 81.6 182.1 37 117.3 2009 205 700 800 78.00 16.01 119 0.308 113 0.559 113 9.856 81.6 182.1 37 117.3 2009 205 800 900 78.00 16.01 119 0.190 93 0.434 93 10.030 81.6 182.1 37 117.3 2009 205 900 1000 78.00 16.01 113 0.197 93 0.488 93 10.044 81.6 182.1 37 117.3 2009 205 1000 1100 78.00 16.01 125 0.287 93 0.581 93 9.983 81.6 182.1 37 117.3 2009 205 1100 1200 78.00 16.01 113 0.216 93 0.535 93 9.823 81.6 182.1 37 117.3 2009 205 1200 1300 78.00 16.01 113 0.149 93 0.337 113 9.864 81.6 182.1 37 117.2 2009 205 1300 1400 78.00 16.01 113 0.160 113 0.230 113 9.797 81.6 182.1 37 117.2 2009 205 1400 1500 78.00 16.01 113 0.142 93 0.545 93 9.955 81.6 182.1 37 117.2 2009 205 1500 1600 78.00 16.01 119 0.190 93 0.400 93 9.718 81.6 182.1 37 117.2 2009 205 1600 1700 78.00 16.01 114 0.166 93 0.521 93 9.982 81.6 182.1 37 117.2 2009 205 1700 1800 78.00 16.01 108 0.228 108 0.836 108 10.141 81.6 182.1 37 117.2 2009 205 1800 1900 78.00 16.01 114 0.188 104 0.567 104 10.164 81.6 182.1 37 117.2 2009 205 1900 2000 78.00 16.01 125 0.120 104 0.285 104 9.768 81.6 182.1 37 117.1 2009 205 2000 2100 78.00 16.01 119 0.261 108 0.550 108 9.878 81.6 182.1 37 117.1 2009 205 2100 2200 78.00 16.01 119 0.215 93 0.503 93 9.914 81.6 182.1 37 117.1 2009 205 2200 2300 78.00 16.01 119 0.230 108 0.577 108 10.025 81.6 182.1 37 117.1 2009 205 2300 2400 78.00 16.01 125 0.197 113 0.386 141 9.757 81.6 182.1 37 117.1 2009 205 2400 2500 78.00 16.01 119 0.230 108 0.678 108 10.140 81.6 182.1 37 117.1 2009 205 2500 2600 78.00 16.01 125 0.256 93 0.520 93 9.764 81.6 182.1 37 117.0 2009 205 2600 2700 78.00 16.01 113 0.183 93 0.364 93 9.757 81.6 182.1 37 117.0 2009 205 2700 2800 78.00 16.01 119 0.283 100 0.726 100 9.842 81.6 182.1 37 117.0 2009 205 2800 2900 78.00 16.01 113 0.209 100 0.495 100 9.958 81.6 182.1 37 117.0 2009 205 2900 3000 78.00 16.01 125 0.266 93 0.451 93 9.771 81.6 182.1 37 117.0 2009 205 3000 3100 78.00 16.01 114 0.192 104 0.721 104 9.928 81.6 182.1 37 116.9 2009 205 3100 3200 78.00 16.01 119 0.395 108 0.565 119 9.991 81.6 182.1 37 116.9 2009 205 3200 3300 78.00 16.01 119 0.188 93 0.455 93 9.712 81.6 182.1 37 116.9 2009 205 3300 3400 78.00 16.01 119 0.259 113 0.385 119 9.717 81.6 182.1 37 116.9 2009 205 3400 3500 78.00 16.01 119 0.249 104 0.453 104 10.017 81.6 182.1 37 116.9 2009 205 3500 3600 78.00 16.01 125 0.254 104 0.822 104 10.260 81.6 182.1 37 116.8 2009 205 3600 3700 78.00 16.01 119 0.291 104 0.578 104 10.013 81.6 182.1 37 116.8 2009 205 3700 3800 78.00 16.01 125 0.272 108 0.660 108 10.010 81.6 182.1 37 116.8 2009 205 3800 3900 78.00 16.01 119 0.246 104 0.301 141 9.731 81.6 182.1 37 116.8 2009 205 3900 4000 78.00 16.01 125 0.280 104 0.536 104 9.880 81.6 182.1 37 116.8 2009 205 4000 4100 78.00 16.01 125 0.189 104 0.286 104 9.927 81.6 182.1 37 116.7 2009 205 4100 4200 78.00 16.01 119 0.264 93 0.435 93 9.879 81.6 182.1 37 116.7 2009 205 4200 4300 78.00 16.01 125 0.186 93 0.319 141 9.680 81.6 182.1 37 116.7 2009 205 4300 4400 78.00 16.01 125 0.193 108 0.355 125 9.683 81.6 182.1 37 116.7 2009 205 4400 4500 78.00 16.01 108 0.139 108 0.433 108 9.784 81.6 182.1 37 116.6 2009 205 4500 4600 78.00 16.01 125 0.204 108 0.265 125 9.912 81.6 182.1 37 116.6 2009 205 4600 4700 78.00 16.01 133 0.381 93 0.491 133 10.303 81.6 182.1 37 116.6 2009 205 4700 4800 78.00 16.01 125 0.149 104 0.259 125 9.815 81.6 182.1 37 116.6 2009 205 4800 4900 78.00 16.01 133 0.266 108 0.433 133 9.873 81.6 182.1 37 116.6 2009 205 4900 5000 78.00 16.01 119 0.196 104 0.424 104 9.955 81.6 182.1 37 116.5 2009 205 5000 5100 78.00 16.01 119 0.215 93 0.280 133 9.653 81.6 182.1 37 116.5 2009 205 5100 5200 78.00 16.01 119 0.188 108 0.413 108 9.783 81.6 182.1 37 116.5 2009 205 5200 5300 78.00 16.01 119 0.206 93 0.425 93 9.635 81.6 182.1 37 116.5 2009 205 5300 5400 78.00 16.01 119 0.267 93 0.515 93 9.790 81.6 182.1 37 116.4 2009 205 5400 5500 78.00 16.01 125 0.296 93 0.388 125 9.857 81.6 182.1 37 116.4 2009 205 5500 5600 78.00 16.01 125 0.230 104 0.546 104 9.935 81.6 182.1 37 116.4 2009 205 5600 5700 78.00 16.01 119 0.185 93 0.313 133 9.628 81.6 182.1 37 116.4 2009 205 5700 5800 78.00 16.01 125 0.129 108 0.357 108 9.846 81.6 182.1 37 116.3 2009 205 5800 5900 78.00 16.01 119 0.180 93 0.320 119 9.643 81.6 182.1 37 116.3 2009 205 5900 10000 78.00 16.01 119 0.191 93 0.281 141 9.901 81.6 182.1 37 116.3 2009 205 10000 10100 78.00 16.01 125 0.285 104 0.524 104 10.141 81.6 182.1 37 116.3 2009 205 10100 10200 78.00 16.01 133 0.325 108 0.429 133 9.864 81.6 182.1 37 116.2 2009 205 10200 10300 78.00 16.01 119 0.420 108 0.456 142 9.954 81.6 182.1 37 116.2 2009 205 10300 10400 78.00 16.01 125 1.099 113 1.066 141 10.411 81.6 182.1 37 116.2 2009 205 10400 10500 78.00 16.01 119 6.584 108 11.884 119 11.090 81.6 182.1 37 116.2 2009 205 10500 10600 78.00 16.01 119 1.911 93 4.303 93 10.508 81.6 182.1 37 116.1 2009 205 10600 10700 78.00 16.01 119 2.261 100 3.875 141 10.636 81.6 182.1 37 116.1 2009 205 10700 10800 78.00 16.01 119 3.734 97 12.699 97 11.130 81.6 182.1 37 116.1 2009 205 10800 10900 78.00 16.01 114 3.455 104 11.327 104 10.894 81.6 182.1 37 116.1 2009 205 10900 11000 78.00 16.01 119 2.004 108 4.743 108 10.586 81.6 182.1 37 116.0 2009 205 11000 11100 78.00 16.01 113 1.228 100 3.167 100 10.447 81.6 182.1 37 116.0 2009 205 11100 11200 78.00 16.01 119 1.073 104 2.570 104 10.411 81.6 182.1 37 116.0 2009 205 11200 11300 78.00 16.01 125 0.687 100 1.720 100 10.615 81.6 182.1 37 115.9 2009 205 11300 11400 78.00 16.01 125 0.544 104 1.667 104 10.391 81.6 182.1 37 115.9 2009 205 11400 11500 78.00 16.01 133 0.537 108 1.379 108 10.288 81.6 182.1 37 115.9 2009 205 11500 11600 78.00 16.01 119 0.737 104 3.147 104 10.553 81.6 182.1 37 115.9 2009 205 11600 11700 78.00 16.01 119 0.488 93 2.039 93 10.257 81.6 182.1 37 115.8 2009 205 11700 11800 78.00 16.01 113 0.559 97 1.966 97 10.243 81.6 182.1 37 115.8 2009 205 11800 11900 78.00 16.01 119 0.890 108 1.702 108 10.224 81.6 182.1 37 115.8 2009 205 11900 12000 78.00 16.01 125 0.904 104 1.336 141 10.279 81.6 182.1 37 115.7 2009 205 12000 12100 78.00 16.01 133 2.007 93 1.138 141 10.860 81.6 182.1 37 115.7 2009 205 12100 12200 78.00 16.01 133 2.046 108 1.236 141 10.828 81.6 182.1 37 115.7 2009 205 12200 12300 78.00 16.01 132 1.005 108 0.682 142 10.595 81.6 182.1 37 115.7 2009 205 12300 12400 78.00 16.01 125 1.531 108 1.275 141 10.579 81.6 182.1 37 115.6 2009 205 12400 12500 78.00 16.01 119 1.095 104 1.240 141 10.392 81.6 182.1 37 115.6 2009 205 12500 12600 78.00 16.01 119 0.745 93 0.697 141 10.147 81.6 182.1 37 115.6 2009 205 12600 12700 78.00 16.01 119 0.773 104 0.887 104 10.194 81.6 182.1 37 115.5 2009 205 12700 12800 78.00 16.01 119 0.707 119 0.740 125 10.095 81.6 182.1 37 115.5 2009 205 12800 12900 78.00 16.01 119 0.788 113 0.844 132 10.159 81.6 182.1 37 115.5 2009 205 12900 13000 78.00 16.01 132 1.219 104 0.814 141 10.510 81.6 182.1 37 115.4 2009 205 13000 13100 78.00 16.01 125 0.922 113 0.873 141 10.229 81.6 182.1 37 115.4 2009 205 13100 13200 78.00 16.01 119 0.921 93 1.028 141 10.293 81.6 182.1 37 115.4 2009 205 13200 13300 78.00 16.01 125 0.779 108 0.821 141 10.282 81.6 182.1 37 115.3 2009 205 13300 13400 78.00 16.01 125 2.750 119 2.151 125 10.735 81.6 182.1 37 115.3 2009 205 13400 13500 78.00 16.01 125 2.702 113 2.327 141 10.771 81.6 182.1 37 115.3 2009 205 13500 13600 78.00 16.01 113 0.939 113 0.981 141 10.418 81.6 182.1 37 115.2 2009 205 13600 13700 78.00 16.01 125 4.036 119 1.877 141 11.040 81.6 182.1 37 115.2 2009 205 13700 13800 78.00 16.01 125 4.980 104 2.863 142 11.114 81.6 182.1 37 115.2 2009 205 13800 13900 78.00 16.01 125 3.795 108 2.876 141 10.932 81.6 182.1 37 115.1 2009 205 13900 14000 78.00 16.01 125 3.544 104 2.764 141 10.967 81.6 182.1 37 115.1 2009 205 14000 14100 78.00 16.01 125 4.048 104 3.014 142 10.992 81.6 182.1 37 115.1 2009 205 14100 14200 78.00 16.01 125 11.984 119 6.507 133 11.446 81.6 182.1 37 115.0 2009 205 14200 14300 78.00 16.01 119 17.779 119 14.654 125 11.541 81.6 182.1 37 115.0 2009 205 14300 14400 78.00 16.01 125 12.743 119 9.245 132 11.410 81.6 182.1 37 115.0 2009 205 14400 14500 78.00 16.01 119 13.190 119 10.765 141 11.395 81.6 182.1 37 114.9 2009 205 14500 14600 78.00 16.01 119 11.902 119 10.122 141 11.338 81.6 182.1 37 114.9 2009 205 14600 14700 78.00 16.01 119 20.935 113 21.817 126 11.604 81.6 182.1 37 114.9 2009 205 14700 14800 78.00 16.01 126 10.256 100 9.883 141 11.360 81.6 182.1 37 114.8 2009 205 14800 14900 78.00 16.01 125 7.225 104 6.646 142 11.192 81.6 182.1 37 114.8 2009 205 14900 15000 78.00 16.01 125 5.854 113 2.826 141 11.194 81.6 182.1 37 114.8 2009 205 15000 15100 78.00 16.01 119 18.892 113 17.319 125 11.545 81.6 182.1 37 114.7 2009 205 15100 15200 78.00 16.01 119 11.522 113 10.336 133 11.305 81.6 182.1 37 114.7 2009 205 15200 15300 78.00 16.01 125 3.814 113 2.973 141 10.953 81.6 182.1 37 114.7 2009 205 15300 15400 78.00 16.01 119 2.211 113 2.786 141 10.593 81.6 182.1 37 114.6 2009 205 15400 15500 78.00 16.01 119 2.520 113 3.084 141 10.634 81.6 182.1 37 114.6 2009 205 15500 15600 78.00 16.01 125 3.493 113 3.583 141 10.846 81.6 182.1 37 114.6 2009 205 15600 15700 78.00 16.01 119 2.948 108 3.519 108 10.690 81.6 182.1 37 114.5 2009 205 15700 15800 78.00 16.01 125 2.842 108 2.744 141 10.756 81.6 182.1 37 114.5 2009 205 15800 15900 78.00 16.01 125 3.284 114 2.793 142 10.805 81.6 182.1 37 114.4 2009 205 15900 20000 78.00 16.01 125 4.837 113 3.877 141 11.094 81.6 182.1 37 114.4 2009 205 20000 20100 78.00 16.01 133 2.133 113 2.395 141 10.734 81.6 182.1 37 114.4 2009 205 20100 20200 78.00 16.01 125 2.272 113 1.933 141 10.713 81.6 182.1 37 114.3 2009 205 20200 20300 78.00 16.01 113 1.753 108 1.633 142 10.575 81.6 182.1 37 114.3 2009 205 20300 20400 78.00 16.01 125 1.974 108 2.165 141 10.583 81.6 182.1 37 114.3 2009 205 20400 20500 78.00 16.01 108 0.882 104 1.907 104 10.536 81.6 182.1 37 114.2 2009 205 20500 20600 78.00 16.01 119 1.311 108 2.240 108 10.490 81.6 182.1 37 114.2 2009 205 20600 20700 78.00 16.01 119 1.508 108 2.248 141 10.485 81.6 182.1 37 114.1 2009 205 20700 20800 78.00 16.01 119 1.573 104 2.304 142 10.473 81.6 182.1 37 114.1 2009 205 20800 20900 78.00 16.01 119 1.791 113 1.914 141 10.545 81.6 182.1 37 114.1 2009 205 20900 21000 78.00 16.01 119 1.783 113 2.198 141 10.535 81.6 182.1 37 114.0 2009 205 21000 21100 78.00 16.01 125 1.772 108 2.211 141 10.536 81.6 182.1 37 114.0 2009 205 21100 21200 78.00 16.01 119 1.721 114 2.199 141 10.512 81.6 182.1 37 114.0 2009 205 21200 21300 78.00 16.01 119 2.469 108 2.731 141 10.672 81.6 182.1 37 113.9 2009 205 21300 21400 78.00 16.01 119 3.046 113 3.545 141 10.736 81.6 182.1 37 113.9 2009 205 21400 21500 78.00 16.01 119 3.337 113 4.032 142 10.777 81.6 182.1 37 113.8 2009 205 21500 21600 78.00 16.01 119 3.552 113 4.984 141 10.790 81.6 182.1 37 113.8 2009 205 21600 21700 78.00 16.01 119 2.964 114 3.378 133 10.718 81.6 182.1 37 113.8 2009 205 21700 21800 78.00 16.01 119 3.263 104 5.105 104 10.748 81.6 182.1 37 113.7 2009 205 21800 21900 78.00 16.01 119 2.516 114 3.373 141 10.648 81.6 182.1 37 113.7 2009 205 21900 22000 78.00 16.01 119 2.549 113 3.234 132 10.659 81.6 182.1 37 113.6 2009 205 22000 22100 78.00 16.01 119 2.545 113 3.504 133 10.672 81.6 182.1 37 113.6 2009 205 22100 22200 78.00 16.01 119 3.025 113 3.990 133 10.705 81.6 182.1 37 113.6 2009 205 22200 22300 78.00 16.01 119 3.017 108 4.108 133 10.710 81.6 182.1 37 113.5 2009 205 22300 22400 78.00 16.01 119 2.930 100 4.173 141 10.705 81.6 182.1 37 113.5 2009 205 22400 22500 78.00 16.01 119 2.841 113 3.202 119 10.703 81.6 182.1 37 113.4 2009 205 22500 22600 78.00 16.01 119 2.732 104 3.944 104 10.760 81.6 182.1 37 113.4 2009 205 22600 22700 78.00 16.01 119 2.908 113 4.290 125 10.700 81.6 182.1 37 113.4 2009 205 22700 22800 78.00 16.01 119 2.607 113 3.272 133 10.662 81.6 182.1 37 113.3 2009 205 22800 22900 78.00 16.01 119 2.538 114 3.568 114 10.627 81.6 182.1 37 113.3 2009 205 22900 23000 78.00 16.01 119 2.282 113 3.236 133 10.615 81.6 182.1 37 113.2 2009 205 23000 23100 78.00 16.01 119 2.316 113 2.454 133 10.635 81.6 182.1 37 113.2 2009 205 23100 23200 78.00 16.01 119 2.640 108 3.303 125 10.671 81.6 182.1 37 113.2 2009 205 23200 23300 78.00 16.01 119 2.952 104 3.899 104 10.876 81.6 182.1 37 113.1 2009 205 23300 23400 78.00 16.01 119 2.763 113 3.480 141 10.707 81.6 182.1 37 113.1 2009 205 23400 23500 78.00 16.01 119 2.618 113 3.319 133 10.673 81.6 182.1 37 113.0 2009 205 23500 23600 78.00 16.01 119 2.613 114 3.199 133 10.677 81.6 182.1 37 113.0 2009 205 23600 23700 78.00 16.01 119 2.825 114 3.328 125 10.701 81.6 182.1 37 112.9 2009 205 23700 23800 78.00 16.01 119 3.041 108 4.057 133 10.716 81.6 182.1 37 112.9 2009 205 23800 23900 78.00 16.01 119 2.932 104 3.935 104 10.798 81.6 182.1 37 112.9 2009 205 23900 24000 78.00 16.01 119 3.296 113 4.434 125 10.761 81.6 182.1 37 112.8 2009 205 24000 24100 78.00 16.01 119 2.702 100 3.861 125 10.652 81.6 182.1 37 112.8 2009 205 24100 24200 78.00 16.01 119 2.652 108 3.590 125 10.660 81.6 182.1 37 112.7 2009 205 24200 24300 78.00 16.01 119 2.788 100 4.330 113 10.658 81.6 182.1 37 112.7 2009 205 24300 24400 78.00 16.01 119 2.883 108 3.736 125 10.690 81.6 182.1 37 112.6 2009 205 24400 24500 78.00 16.01 119 2.692 100 4.043 133 10.680 81.6 182.1 37 112.6 2009 205 24500 24600 78.00 16.01 119 2.850 100 3.940 100 10.793 81.6 182.1 37 112.6 2009 205 24600 24700 78.00 16.01 119 3.122 100 4.578 100 10.762 81.6 182.1 37 112.5 2009 205 24700 24800 78.00 16.01 119 3.159 113 4.280 125 10.749 81.6 182.1 37 112.5 2009 205 24800 24900 78.00 16.01 119 3.054 113 3.856 125 10.717 81.6 182.1 37 112.4 2009 205 24900 25000 78.00 16.01 119 3.044 113 3.560 133 10.736 81.6 182.1 37 112.4 2009 205 25000 25100 78.00 16.01 119 3.315 104 4.892 119 10.752 81.6 182.1 37 112.3 2009 205 25100 25200 78.00 16.01 119 3.573 104 5.747 119 10.797 81.6 182.1 37 112.3 2009 205 25200 25300 78.00 16.01 119 3.228 113 4.769 119 10.765 81.6 182.1 37 112.3 2009 205 25300 25400 78.00 16.01 119 2.970 113 3.984 125 10.743 81.6 182.1 37 112.2 2009 205 25400 25500 78.00 16.01 119 3.440 113 4.986 119 10.774 81.6 182.1 37 112.2 2009 205 25500 25600 78.00 16.01 119 3.114 104 5.747 104 10.777 81.6 182.1 37 112.1 2009 205 25600 25700 78.00 16.01 119 2.631 113 3.193 119 10.674 81.6 182.1 37 112.1 2009 205 25700 25800 78.00 16.01 119 2.673 113 3.443 125 10.666 81.6 182.1 37 112.0 2009 205 25800 25900 78.00 16.01 119 2.744 113 3.075 125 10.696 81.6 182.1 37 112.0 2009 205 25900 30000 78.00 16.01 119 2.698 113 3.249 125 10.684 81.6 182.1 37 111.9 2009 205 30000 30100 78.00 16.01 119 2.766 114 3.142 119 10.692 81.6 182.1 20 111.9 2009 205 30100 30200 78.00 16.01 119 2.881 104 3.457 119 10.718 81.6 182.1 20 111.9 2009 205 30200 30300 78.00 16.01 119 2.905 113 3.691 125 10.702 81.6 182.1 20 111.8 2009 205 30300 30400 78.00 16.01 119 2.593 108 3.547 133 10.660 81.6 182.1 20 111.8 2009 205 30400 30500 78.00 16.01 119 2.735 104 3.900 119 10.670 81.6 182.1 20 111.7 2009 205 30500 30600 78.00 16.01 119 2.852 113 4.009 113 10.673 81.6 182.1 20 111.7 2009 205 30600 30700 78.00 16.01 119 2.980 114 4.120 119 10.705 81.6 182.1 20 111.6 2009 205 30700 30800 78.00 16.01 119 3.339 100 4.935 100 10.890 81.6 182.1 20 111.6 2009 205 30800 30900 78.00 16.01 119 3.114 114 4.126 132 10.737 81.6 182.1 20 111.5 2009 205 30900 31000 78.00 16.01 119 3.213 113 4.841 113 10.757 81.6 182.1 20 111.5 2009 205 31000 31100 78.00 16.01 119 2.733 113 3.614 133 10.699 81.6 182.1 20 111.4 2009 205 31100 31200 78.00 16.01 119 3.160 113 4.414 119 10.767 81.6 182.1 20 111.4 2009 205 31200 31300 78.00 16.01 119 3.766 108 6.221 119 10.831 81.6 182.1 20 111.3 2009 205 31300 31400 78.00 16.01 119 3.866 104 6.098 119 10.834 81.6 182.1 20 111.3 2009 205 31400 31500 78.00 16.01 119 2.781 100 4.169 100 10.787 81.6 182.1 20 111.3 2009 205 31500 31600 78.00 16.01 119 2.713 113 4.322 113 10.677 81.6 182.1 20 111.2 2009 205 31600 31700 78.00 16.01 119 2.671 114 4.145 114 10.691 81.6 182.1 20 111.2 2009 205 31700 31800 78.00 16.01 119 3.614 108 5.573 125 10.814 81.6 182.1 20 111.1 2009 205 31800 31900 78.00 16.01 119 3.257 113 4.723 119 10.754 81.6 182.1 20 111.1 2009 205 31900 32000 78.00 16.01 119 3.404 108 5.285 125 10.787 81.6 182.1 20 111.0 2009 205 32000 32100 78.00 16.01 119 3.185 113 4.006 113 10.730 81.6 182.1 20 111.0 2009 205 32100 32200 78.00 16.01 125 3.238 113 3.609 125 10.864 81.6 182.1 20 110.9 2009 205 32200 32300 78.00 16.01 119 3.465 100 6.552 100 10.914 81.6 182.1 20 110.9 2009 205 32300 32400 78.00 16.01 119 3.334 113 5.099 113 10.794 81.6 182.1 20 110.8 2009 205 32400 32500 78.00 16.01 119 3.253 113 4.286 113 10.780 81.6 182.1 20 110.8 2009 205 32500 32600 78.00 16.01 119 3.540 104 5.839 104 10.897 81.6 182.1 20 110.7 2009 205 32600 32700 78.00 16.01 119 4.186 114 5.260 132 10.860 81.6 182.1 20 110.7 2009 205 32700 32800 78.00 16.01 119 3.915 108 6.075 119 10.842 81.6 182.1 20 110.6 2009 205 32800 32900 78.00 16.01 119 3.758 108 5.438 113 10.835 81.6 182.1 20 110.6 2009 205 32900 33000 78.00 16.01 119 3.280 113 4.299 113 10.770 81.6 182.1 20 110.5 2009 205 33000 33100 78.00 16.01 119 3.565 113 4.679 125 10.776 81.6 182.1 20 110.5 2009 205 33100 33200 78.00 16.01 119 3.107 113 3.367 133 10.745 81.6 182.1 20 110.4 2009 205 33200 33300 78.00 16.01 119 3.466 113 5.179 113 10.785 81.6 182.1 20 110.4 2009 205 33300 33400 78.00 16.01 119 4.119 114 6.479 114 10.920 81.6 182.1 20 110.4 2009 205 33400 33500 78.00 16.01 119 4.090 113 5.491 113 10.876 81.6 182.1 20 110.3 2009 205 33500 33600 78.00 16.01 119 3.827 114 5.747 114 10.848 81.6 182.1 20 110.3 2009 205 33600 33700 78.00 16.01 119 3.646 100 5.446 114 10.825 81.6 182.1 20 110.2 2009 205 33700 33800 78.00 16.01 119 4.173 108 6.614 119 10.861 81.6 182.1 20 110.2 2009 205 33800 33900 78.00 16.01 119 4.398 113 6.369 113 10.911 81.6 182.1 20 110.1 2009 205 33900 34000 78.00 16.01 119 4.594 108 8.601 108 10.936 81.6 182.1 20 110.1 2009 205 34000 34100 78.00 16.01 119 4.343 114 6.473 114 10.947 81.6 182.1 20 110.0 2009 205 34100 34200 78.00 16.01 119 4.328 108 6.946 108 10.897 81.6 182.1 20 110.0 2009 205 34200 34300 78.00 16.01 119 4.483 113 6.380 113 10.902 81.6 182.1 20 109.9 2009 205 34300 34400 78.00 16.01 119 4.133 114 6.467 114 10.890 81.6 182.1 20 109.9 2009 205 34400 34500 78.00 16.01 119 4.434 100 7.479 100 11.022 81.6 182.1 20 109.8 2009 205 34500 34600 78.00 16.01 119 4.248 113 7.132 113 10.920 81.6 182.1 20 109.8 2009 205 34600 34700 78.00 16.01 119 4.061 114 5.977 114 10.873 81.6 182.1 20 109.7 2009 205 34700 34800 78.00 16.01 119 3.532 114 3.932 125 10.798 81.6 182.1 20 109.7 2009 205 34800 34900 78.00 16.01 119 3.790 113 5.420 113 10.816 81.6 182.1 20 109.6 2009 205 34900 35000 78.00 16.01 119 3.330 113 4.101 133 10.754 81.6 182.1 20 109.6 2009 205 35000 35100 78.00 16.01 119 3.559 100 5.910 100 10.932 81.6 182.1 20 109.5 2009 205 35100 35200 78.00 16.01 119 3.540 108 5.695 108 10.821 81.6 182.1 20 109.5 2009 205 35200 35300 78.00 16.01 119 3.450 113 4.951 113 10.782 81.6 182.1 20 109.4 2009 205 35300 35400 78.00 16.01 119 3.066 113 4.525 113 10.779 81.6 182.1 20 109.4 2009 205 35400 35500 78.00 16.01 119 3.485 108 5.064 108 10.856 81.6 182.1 20 109.3 2009 205 35500 35600 78.00 16.01 119 3.516 114 4.872 114 10.792 81.6 182.1 20 109.3 2009 205 35600 35700 78.00 16.01 119 4.185 113 7.112 113 10.928 81.6 182.1 20 109.2 2009 205 35700 35800 78.00 16.01 119 4.383 114 6.755 114 10.936 81.6 182.1 20 109.2 2009 205 35800 35900 78.00 16.01 119 4.647 108 7.538 108 10.952 81.6 182.1 20 109.1 2009 205 35900 40000 78.00 16.01 119 4.091 114 5.709 114 10.910 81.6 182.1 20 109.1 2009 205 40000 40100 78.00 16.01 119 3.515 113 4.888 113 10.793 81.6 182.1 20 109.0 2009 205 40100 40200 78.00 16.01 119 4.539 114 6.677 119 10.912 81.6 182.1 20 109.0 2009 205 40200 40300 78.00 16.01 119 3.590 114 5.134 125 10.804 81.6 182.1 20 108.9 2009 205 40300 40400 78.00 16.01 119 3.476 104 5.120 104 10.787 81.6 182.1 20 108.9 2009 205 40400 40500 78.00 16.01 119 3.462 113 4.204 125 10.798 81.6 182.1 20 108.8 2009 205 40500 40600 78.00 16.01 119 3.917 114 5.308 114 10.865 81.6 182.1 20 108.8 2009 205 40600 40700 78.00 16.01 119 4.435 114 6.567 119 10.908 81.6 182.1 20 108.7 2009 205 40700 40800 78.00 16.01 119 4.552 108 7.686 113 10.922 81.6 182.1 20 108.7 2009 205 40800 40900 78.00 16.01 119 4.837 100 8.282 100 11.040 81.6 182.1 20 108.6 2009 205 40900 41000 78.00 16.01 119 4.127 113 5.617 119 10.876 81.6 182.1 20 108.6 2009 205 41000 41100 78.00 16.01 119 4.546 113 5.529 119 10.919 81.6 182.1 20 108.5 2009 205 41100 41200 78.00 16.01 119 5.512 113 6.505 119 11.033 81.6 182.1 20 108.5 2009 205 41200 41300 78.00 16.01 119 5.527 113 8.284 113 11.019 81.6 182.1 20 108.4 2009 205 41300 41400 78.00 16.01 119 4.597 113 6.386 125 10.923 81.6 182.1 20 108.4 2009 205 41400 41500 78.00 16.01 119 4.858 114 7.714 114 10.957 81.6 182.1 20 108.3 2009 205 41500 41600 78.00 16.01 119 4.782 100 7.193 100 11.034 81.6 182.1 20 108.3 2009 205 41600 41700 78.00 16.01 119 4.182 108 6.104 119 10.872 81.6 182.1 20 108.2 2009 205 41700 41800 78.00 16.01 119 3.820 113 4.954 125 10.819 81.6 182.1 20 108.2 2009 205 41800 41900 78.00 16.01 119 4.320 108 6.138 119 10.873 81.6 182.1 20 108.1 2009 205 41900 42000 78.00 16.01 119 4.706 113 6.960 113 10.945 81.6 182.1 20 108.1 2009 205 42000 42100 78.00 16.01 119 4.389 100 7.924 100 11.021 81.6 182.1 20 108.0 2009 205 42100 42200 78.00 16.01 119 4.236 113 6.101 119 10.893 81.6 182.1 20 108.0 2009 205 42200 42300 78.00 16.01 119 4.329 113 6.084 119 10.870 81.6 182.1 20 107.9 2009 205 42300 42400 78.00 16.01 119 3.970 114 4.555 125 10.843 81.6 182.1 20 107.9 2009 205 42400 42500 78.00 16.01 119 4.051 104 8.159 104 11.209 81.6 182.1 20 107.8 2009 205 42500 42600 78.00 16.01 119 4.118 114 5.866 114 10.880 81.6 182.1 20 107.8 2009 205 42600 42700 78.00 16.01 119 3.938 114 5.565 114 10.858 81.6 182.1 20 107.7 2009 205 42700 42800 78.00 16.01 119 4.026 113 5.392 119 10.868 81.6 182.1 20 107.7 2009 205 42800 42900 78.00 16.01 119 3.625 114 4.504 119 10.780 81.6 182.1 20 107.6 2009 205 42900 43000 78.00 16.01 119 3.340 108 4.538 141 10.776 81.6 182.1 20 107.6 2009 205 43000 43100 78.00 16.01 119 3.098 113 3.783 125 10.750 81.6 182.1 20 107.5 2009 205 43100 43200 78.00 16.01 119 2.995 100 4.657 133 10.727 81.6 182.1 20 107.5 2009 205 43200 43300 78.00 16.01 119 2.770 113 3.039 133 10.701 81.6 182.1 20 107.4 2009 205 43300 43400 78.00 16.01 119 3.130 113 3.152 125 10.751 81.6 182.1 20 107.3 2009 205 43400 43500 78.00 16.01 119 3.446 104 5.691 104 10.854 81.6 182.1 20 107.3 2009 205 43500 43600 78.00 16.01 119 3.459 114 4.617 119 10.768 81.6 182.1 20 107.2 2009 205 43600 43700 78.00 16.01 119 3.388 114 4.827 133 10.747 81.6 182.1 20 107.2 2009 205 43700 43800 78.00 16.01 119 3.399 108 4.890 125 10.753 81.6 182.1 20 107.1 2009 205 43800 43900 78.00 16.01 119 3.532 104 5.226 104 10.806 81.6 182.1 20 107.1 2009 205 43900 44000 78.00 16.01 119 3.445 113 4.520 119 10.758 81.6 182.1 20 107.0 2009 205 44000 44100 78.00 16.01 119 3.479 114 4.431 125 10.776 81.6 182.1 20 107.0 2009 205 44100 44200 78.00 16.01 119 4.181 113 5.311 113 10.854 81.6 182.1 20 106.9 2009 205 44200 44300 78.00 16.01 119 3.942 108 5.254 119 10.826 81.6 182.1 20 106.9 2009 205 44300 44400 78.00 16.01 119 3.719 113 3.018 132 10.865 81.6 182.1 20 106.8 2009 205 44400 44500 78.00 16.01 119 4.247 113 5.653 125 10.883 81.6 182.1 20 106.8 2009 205 44500 44600 78.00 16.01 119 4.378 108 7.540 133 10.862 81.6 182.1 20 106.7 2009 205 44600 44700 78.00 16.01 119 4.535 100 7.490 100 11.145 81.6 182.1 20 106.7 2009 205 44700 44800 78.00 16.01 119 3.720 113 4.052 125 10.819 81.6 182.1 20 106.6 2009 205 44800 44900 78.00 16.01 119 4.064 114 5.361 114 10.863 81.6 182.1 20 106.6 2009 205 44900 45000 78.00 16.01 125 3.543 114 4.778 125 10.799 81.6 182.1 20 106.5 2009 205 45000 45100 78.00 16.01 119 4.062 113 6.168 125 10.832 81.6 182.1 20 106.5 2009 205 45100 45200 78.00 16.01 119 4.176 113 5.268 125 10.870 81.6 182.1 20 106.4 2009 205 45200 45300 78.00 16.01 119 3.978 113 5.309 113 10.834 81.6 182.1 20 106.4 2009 205 45300 45400 78.00 16.01 119 3.898 113 4.561 133 10.851 81.6 182.1 20 106.3 2009 205 45400 45500 78.00 16.01 119 4.055 100 6.389 100 10.930 81.6 182.1 20 106.3 2009 205 45500 45600 78.00 16.01 125 3.600 113 4.240 125 10.817 81.6 182.1 20 106.2 2009 205 45600 45700 78.00 16.01 119 4.235 113 5.925 113 10.866 81.6 182.1 20 106.2 2009 205 45700 45800 78.00 16.01 119 3.428 108 4.601 133 10.777 81.6 182.1 20 106.1 2009 205 45800 45900 78.00 16.01 119 3.392 113 4.308 133 10.820 81.6 182.1 20 106.1 2009 205 45900 50000 78.00 16.01 125 3.009 108 3.435 141 10.744 81.6 182.1 20 106.0 2009 205 50000 50100 78.00 16.01 119 3.228 108 4.658 119 10.736 81.6 182.1 20 106.0 2009 205 50100 50200 78.00 16.01 119 3.306 108 5.086 108 10.761 81.6 182.1 20 105.9 2009 205 50200 50300 78.00 16.01 119 3.159 114 4.142 141 10.734 81.6 182.1 20 105.9 2009 205 50300 50400 78.00 16.01 125 2.393 104 3.670 104 10.707 81.6 182.1 20 105.8 2009 205 50400 50500 78.00 16.01 125 2.663 113 2.499 142 10.688 81.6 182.1 20 105.8 2009 205 50500 50600 78.00 16.01 119 2.877 113 3.008 141 10.721 81.6 182.1 20 105.7 2009 205 50600 50700 78.00 16.01 119 3.235 100 4.844 141 10.737 81.6 182.1 20 105.7 2009 205 50700 50800 78.00 16.01 125 3.212 113 3.867 125 10.760 81.6 182.1 20 105.6 2009 205 50800 50900 78.00 16.01 119 3.236 114 3.597 132 10.788 81.6 182.1 20 105.5 2009 205 50900 51000 78.00 16.01 119 2.867 114 3.366 133 10.719 81.6 182.1 20 105.5 2009 205 51000 51100 78.00 16.01 125 2.180 100 2.211 141 10.672 81.6 182.1 20 105.4 2009 205 51100 51200 78.00 16.01 78 1.884 78 2.670 119 10.642 81.6 182.1 20 105.4 2009 205 51200 51300 78.00 16.01 119 2.489 108 2.877 141 10.621 81.6 182.1 20 105.3 2009 205 51300 51400 78.00 16.01 125 2.451 108 2.638 141 10.671 81.6 182.1 20 105.3 2009 205 51400 51500 78.00 16.01 119 2.421 93 3.073 141 10.661 81.6 182.1 20 105.2 2009 205 51500 51600 78.00 16.01 125 2.932 108 3.690 125 10.726 81.6 182.1 20 105.2 2009 205 51600 51700 78.00 16.01 125 3.285 113 4.102 132 10.778 81.6 182.1 20 105.1 2009 205 51700 51800 78.00 16.01 119 3.726 113 4.479 132 10.826 81.6 182.1 20 105.1 2009 205 51800 51900 78.00 16.01 125 3.451 100 4.843 133 10.764 81.6 182.1 20 105.0 2009 205 51900 52000 78.00 16.01 119 3.308 104 4.643 141 10.797 81.6 182.1 20 105.0 2009 205 52000 52100 78.00 16.01 119 3.274 108 5.609 132 10.746 81.6 182.1 20 104.9 2009 205 52100 52200 78.00 16.01 119 3.270 108 4.184 133 10.779 81.6 182.1 20 104.9 2009 205 52200 52300 78.00 16.01 119 3.410 104 4.587 133 10.794 81.6 182.1 20 104.8 2009 205 52300 52400 78.00 16.01 125 2.881 108 3.226 125 10.737 81.6 182.1 20 104.8 2009 205 52400 52500 78.00 16.01 125 2.327 114 1.734 142 10.701 81.6 182.1 20 104.7 2009 205 52500 52600 78.00 16.01 114 3.063 108 4.115 114 10.745 81.6 182.1 20 104.7 2009 205 52600 52700 78.00 16.01 119 2.918 114 3.635 141 10.717 81.6 182.1 20 104.6 2009 205 52700 52800 78.00 16.01 119 2.733 104 3.490 104 10.849 81.6 182.1 20 104.6 2009 205 52800 52900 78.00 16.01 125 2.735 104 3.178 133 10.725 81.6 182.1 20 104.5 2009 205 52900 53000 78.00 16.01 125 2.883 114 3.243 141 10.743 81.6 182.1 20 104.5 2009 205 53000 53100 78.00 16.01 125 2.223 100 2.878 141 10.668 81.6 182.1 20 104.4 2009 205 53100 53200 78.00 16.01 119 2.761 119 1.672 142 10.756 81.6 182.1 20 104.4 2009 205 53200 53300 78.00 16.01 119 2.660 113 3.196 133 10.657 81.6 182.1 20 104.3 2009 205 53300 53400 78.00 16.01 119 2.704 113 3.308 141 10.654 81.6 182.1 20 104.3 2009 205 53400 53500 78.00 16.01 125 3.388 113 3.686 125 10.804 81.6 182.1 20 104.2 2009 205 53500 53600 78.00 16.01 119 3.693 113 4.228 132 10.862 81.6 182.1 20 104.2 2009 205 53600 53700 78.00 16.01 119 3.519 104 3.928 133 10.814 81.6 182.1 20 104.1 2009 205 53700 53800 78.00 16.01 119 3.287 113 4.104 133 10.770 81.6 182.1 20 104.1 2009 205 53800 53900 78.00 16.01 119 2.829 113 3.141 133 10.710 81.6 182.1 20 104.0 2009 205 53900 54000 78.00 16.01 119 2.380 113 2.702 141 10.663 81.6 182.1 20 104.0 2009 205 54000 54100 78.00 16.01 119 2.399 113 2.406 133 10.682 81.6 182.1 20 103.9 2009 205 54100 54200 78.00 16.01 119 2.498 113 2.361 133 10.624 81.6 182.1 20 103.9 2009 205 54200 54300 78.00 16.01 119 2.756 104 3.027 133 10.694 81.6 182.1 20 103.8 2009 205 54300 54400 78.00 16.01 125 2.114 114 1.349 125 10.685 81.6 182.1 20 103.8 2009 205 54400 54500 78.00 16.01 125 2.170 113 1.851 133 10.651 81.6 182.1 20 103.7 2009 205 54500 54600 78.00 16.01 125 2.503 97 3.438 142 10.685 81.6 182.1 20 103.7 2009 205 54600 54700 78.00 16.01 125 1.967 108 2.257 133 10.550 81.6 182.1 20 103.6 2009 205 54700 54800 78.00 16.01 119 1.727 113 1.692 141 10.589 81.6 182.1 20 103.6 2009 205 54800 54900 78.00 16.01 119 2.139 119 1.466 133 10.637 81.6 182.1 20 103.5 2009 205 54900 55000 78.00 16.01 125 2.930 113 2.791 133 10.774 81.6 182.1 20 103.5 2009 205 55000 55100 78.00 16.01 125 2.482 119 2.068 133 10.703 81.6 182.1 20 103.4 2009 205 55100 55200 78.00 16.01 119 2.807 114 3.003 141 10.696 81.6 182.1 20 103.4 2009 205 55200 55300 78.00 16.01 119 2.849 113 2.773 133 10.732 81.6 182.1 20 103.3 2009 205 55300 55400 78.00 16.01 125 2.056 108 1.818 133 10.629 81.6 182.1 20 103.3 2009 205 55400 55500 78.00 16.01 125 1.332 113 0.904 133 10.411 81.6 182.1 20 103.2 2009 205 55500 55600 78.00 16.01 125 1.669 113 1.527 142 10.572 81.6 182.1 20 103.2 2009 205 55600 55700 78.00 16.01 119 2.647 108 3.168 108 10.846 81.6 182.1 20 103.1 2009 205 55700 55800 78.00 16.01 119 2.942 113 2.598 133 10.754 81.6 182.1 20 103.1 2009 205 55800 55900 78.00 16.01 125 2.523 113 2.240 142 10.706 81.6 182.1 20 103.0 2009 205 55900 60000 78.00 16.01 125 2.419 119 2.055 142 10.705 81.6 182.1 20 103.0 2009 205 60000 60100 78.00 16.01 125 2.377 119 1.722 125 10.674 81.6 182.1 10 102.9 2009 205 60100 60200 78.00 16.01 125 2.509 119 2.203 133 10.717 81.6 182.1 10 102.9 2009 205 60200 60300 78.00 16.01 125 2.215 114 1.855 133 10.681 81.6 182.1 10 102.8 2009 205 60300 60400 78.00 16.01 119 2.571 114 2.697 133 10.686 81.6 182.1 10 102.8 2009 205 60400 60500 78.00 16.01 119 2.022 113 1.980 141 10.580 81.6 182.1 10 102.7 2009 205 60500 60600 78.00 16.01 119 2.077 113 1.975 132 10.578 81.6 182.1 10 102.7 2009 205 60600 60700 78.00 16.01 125 2.409 113 2.675 125 10.681 81.6 182.1 10 102.6 2009 205 60700 60800 78.00 16.01 125 2.300 113 2.278 133 10.647 81.6 182.1 10 102.6 2009 205 60800 60900 78.00 16.01 125 2.224 104 2.158 132 10.636 81.6 182.1 10 102.5 2009 205 60900 61000 78.00 16.01 119 2.637 113 2.439 125 10.723 81.6 182.1 10 102.5 2009 205 61000 61100 78.00 16.01 119 2.363 113 2.075 125 10.679 81.6 182.1 10 102.4 2009 205 61100 61200 78.00 16.01 119 2.628 108 2.947 119 10.689 81.6 182.1 10 102.4 2009 205 61200 61300 78.00 16.01 119 2.370 113 2.495 133 10.647 81.6 182.1 10 102.3 2009 205 61300 61400 78.00 16.01 119 2.606 113 3.017 125 10.686 81.6 182.1 10 102.3 2009 205 61400 61500 78.00 16.01 125 2.392 113 2.559 125 10.647 81.6 182.1 10 102.2 2009 205 61500 61600 78.00 16.01 125 2.750 114 2.616 125 10.748 81.6 182.1 10 102.2 2009 205 61600 61700 78.00 16.01 125 3.154 113 3.353 125 10.800 81.6 182.1 10 102.1 2009 205 61700 61800 78.00 16.01 119 2.809 108 3.181 133 10.713 81.6 182.1 10 102.1 2009 205 61800 61900 78.00 16.01 119 2.312 114 2.345 133 10.632 81.6 182.1 10 102.0 2009 205 61900 62000 78.00 16.01 119 2.013 113 1.851 133 10.575 81.6 182.1 10 102.0 2009 205 62000 62100 78.00 16.01 125 2.256 113 2.341 125 10.615 81.6 182.1 10 101.9 2009 205 62100 62200 78.00 16.01 119 3.474 113 3.988 125 10.813 81.6 182.1 10 101.9 2009 205 62200 62300 78.00 16.01 119 3.887 113 4.763 119 10.873 81.6 182.1 10 101.8 2009 205 62300 62400 78.00 16.01 119 3.535 113 4.483 119 10.809 81.6 182.1 10 101.8 2009 205 62400 62500 78.00 16.01 119 3.315 113 4.486 125 10.751 81.6 182.1 10 101.7 2009 205 62500 62600 78.00 16.01 119 3.165 113 4.275 113 10.775 81.6 182.1 10 101.7 2009 205 62600 62700 78.00 16.01 119 3.157 113 4.381 119 10.789 81.6 182.1 10 101.6 2009 205 62700 62800 78.00 16.01 119 2.725 114 3.516 119 10.709 81.6 182.1 10 101.6 2009 205 62800 62900 78.00 16.01 119 2.428 113 2.777 133 10.677 81.6 182.1 10 101.5 2009 205 62900 63000 78.00 16.01 119 2.913 104 2.983 125 10.709 81.6 182.1 10 101.5 2009 205 63000 63100 78.00 16.01 125 2.929 113 2.619 125 10.714 81.6 182.1 10 101.4 2009 205 63100 63200 78.00 16.01 119 2.409 113 1.974 125 10.647 81.6 182.1 10 101.4 2009 205 63200 63300 78.00 16.01 119 2.244 104 2.429 133 10.634 81.6 182.1 10 101.4 2009 205 63300 63400 78.00 16.01 119 2.739 113 3.023 125 10.695 81.6 182.1 10 101.3 2009 205 63400 63500 78.00 16.01 119 3.038 108 3.987 119 10.739 81.6 182.1 10 101.3 2009 205 63500 63600 78.00 16.01 119 3.419 113 3.710 125 10.834 81.6 182.1 10 101.2 2009 205 63600 63700 78.00 16.01 119 2.860 113 3.585 125 10.698 81.6 182.1 10 101.2 2009 205 63700 63800 78.00 16.01 119 2.735 108 3.268 125 10.703 81.6 182.1 10 101.1 2009 205 63800 63900 78.00 16.01 119 2.481 104 3.055 125 10.643 81.6 182.1 10 101.1 2009 205 63900 64000 78.00 16.01 119 2.720 113 3.167 125 10.715 81.6 182.1 10 101.0 2009 205 64000 64100 78.00 16.01 119 2.725 113 2.627 125 10.727 81.6 182.1 10 101.0 2009 205 64100 64200 78.00 16.01 119 2.539 113 2.847 133 10.662 81.6 182.1 10 100.9 2009 205 64200 64300 78.00 16.01 118 2.399 113 2.844 118 10.600 81.6 182.1 10 100.9 2009 205 64300 64400 78.00 16.01 119 2.850 113 3.866 119 10.696 81.6 182.1 10 100.8 2009 205 64400 64500 78.00 16.01 119 3.146 113 3.930 119 10.746 81.6 182.1 10 100.8 2009 205 64500 64600 78.00 16.01 119 3.431 114 5.221 119 10.813 81.6 182.1 10 100.7 2009 205 64600 64700 78.00 16.01 119 2.544 104 3.538 133 10.657 81.6 182.1 10 100.7 2009 205 64700 64800 78.00 16.01 119 2.285 113 2.939 113 10.633 81.6 182.1 10 100.7 2009 205 64800 64900 78.00 16.01 119 2.531 113 3.635 113 10.672 81.6 182.1 10 100.6 2009 205 64900 65000 78.00 16.01 119 2.016 100 2.870 100 10.609 81.6 182.1 10 100.6 2009 205 65000 65100 78.00 16.01 119 2.201 100 2.957 119 10.639 81.6 182.1 10 100.5 2009 205 65100 65200 78.00 16.01 119 2.526 108 3.063 125 10.690 81.6 182.1 10 100.5 2009 205 65200 65300 78.00 16.01 119 2.514 114 2.506 125 10.709 81.6 182.1 10 100.4 2009 205 65300 65400 78.00 16.01 119 2.459 113 2.403 125 10.710 81.6 182.1 10 100.4 2009 205 65400 65500 78.00 16.01 119 1.710 113 1.740 125 10.483 81.6 182.1 10 100.3 2009 205 65500 65600 78.00 16.01 119 1.697 114 1.668 119 10.493 81.6 182.1 10 100.3 2009 205 65600 65700 78.00 16.01 119 1.669 100 2.292 100 10.642 81.6 182.1 10 100.2 2009 205 65700 65800 78.00 16.01 119 1.880 113 2.624 119 10.501 81.6 182.1 10 100.2 2009 205 65800 65900 78.00 16.01 119 2.386 114 2.939 119 10.649 81.6 182.1 10 100.2 2009 205 65900 70000 78.00 16.01 119 2.321 113 2.783 119 10.613 81.6 182.1 10 100.1 2009 205 70000 70042 78.00 16.01 119 2.360 100 3.352 100 10.705 81.6 182.1 10 100.1 2009 205 70742 70800 78.00 16.01 119 2.855 114 3.427 114 10.761 81.6 182.1 10 99.8 2009 205 70800 70900 78.00 16.01 119 2.613 113 3.859 113 10.708 81.6 182.1 10 99.7 2009 205 70900 71000 78.00 16.01 119 2.556 113 3.716 113 10.641 81.6 182.1 10 99.7 2009 205 71000 71100 78.00 16.01 119 2.533 108 4.024 108 10.660 81.6 182.1 10 99.6 2009 205 71100 71200 78.00 16.01 119 2.447 113 3.818 119 10.632 81.6 182.1 10 99.6 2009 205 71200 71300 78.00 16.01 119 2.402 104 3.900 125 10.638 81.6 182.1 10 99.5 2009 205 71300 71400 78.00 16.01 119 2.274 104 3.326 119 10.609 81.6 182.1 10 99.5 2009 205 71400 71500 78.00 16.01 119 1.710 113 2.124 132 10.476 81.6 182.1 10 99.4 2009 205 71500 71600 78.00 16.01 119 1.583 100 2.414 100 10.558 81.6 182.1 10 99.4 2009 205 71600 71700 78.00 16.01 119 2.004 100 2.870 119 10.575 81.6 182.1 10 99.4 2009 205 71700 71800 78.00 16.01 119 1.929 93 2.282 141 10.572 81.6 182.1 10 99.3 2009 205 71800 71900 78.00 16.01 119 2.011 113 2.602 125 10.547 81.6 182.1 10 99.3 2009 205 71900 72000 78.00 16.01 119 2.357 114 2.956 125 10.617 81.6 182.1 10 99.2 2009 205 72000 72100 78.00 16.01 119 2.269 114 3.477 125 10.629 81.6 182.1 10 99.2 2009 205 72100 72200 78.00 16.01 119 2.037 100 2.901 100 10.590 81.6 182.1 10 99.1 2009 205 72200 72300 78.00 16.01 119 2.058 113 2.710 125 10.556 81.6 182.1 10 99.1 2009 205 72300 72400 78.00 16.01 119 2.077 100 3.517 100 10.850 81.6 182.1 10 99.1 2009 205 72400 72500 78.00 16.01 119 1.875 113 2.509 125 10.521 81.6 182.1 10 99.0 2009 205 72500 72600 78.00 16.01 119 1.716 108 2.353 125 10.488 81.6 182.1 10 99.0 2009 205 72600 72700 78.00 16.01 119 1.959 100 2.995 100 10.774 81.6 182.1 10 98.9 2009 205 72700 72706 77.84 15.98 -99 -99.990 -99 -99.990 -99 -99.990 81.6 182.1 10 98.9 2009 205 73736 73800 78.00 16.01 125 1.507 108 1.876 108 10.504 81.6 182.1 10 98.5 2009 205 73800 73900 78.00 16.01 119 1.919 104 2.811 119 10.506 81.6 182.1 10 98.4 2009 205 73900 74000 78.00 16.01 119 1.502 113 1.671 113 10.403 81.6 182.1 10 98.4 2009 205 74000 74100 78.00 16.01 119 1.851 114 2.946 119 10.537 81.6 182.1 10 98.4 2009 205 74100 74200 78.00 16.01 119 2.071 114 2.752 125 10.551 81.6 182.1 10 98.3 2009 205 74200 74300 78.00 16.01 119 2.070 104 4.121 104 10.777 81.6 182.1 10 98.3 2009 205 74300 74400 78.00 16.01 119 2.035 104 3.384 119 10.565 81.6 182.1 10 98.2 2009 205 74400 74500 78.00 16.01 119 1.795 104 2.128 132 10.523 81.6 182.1 10 98.2 2009 205 74500 74600 78.00 16.01 119 1.750 104 2.324 125 10.508 81.6 182.1 10 98.2 2009 205 74600 74700 78.00 16.01 119 1.593 108 2.376 142 10.442 81.6 182.1 10 98.1 2009 205 74700 74800 78.00 16.01 119 1.613 104 2.783 104 10.583 81.6 182.1 10 98.1 2009 205 74800 74900 78.00 16.01 119 1.445 104 2.034 104 10.470 81.6 182.1 10 98.1 2009 205 74900 75000 78.00 16.01 119 1.400 108 1.754 119 10.422 81.6 182.1 10 98.0 2009 205 75000 75100 78.00 16.01 119 1.771 104 2.799 104 10.537 81.6 182.1 10 98.0 2009 205 75100 75200 78.00 16.01 119 1.892 108 2.884 125 10.505 81.6 182.1 10 97.9 2009 205 75200 75300 78.00 16.01 119 1.741 100 3.027 100 10.609 81.6 182.1 10 97.9 2009 205 75300 75400 78.00 16.01 119 1.672 100 2.899 100 10.643 81.6 182.1 10 97.9 2009 205 75400 75500 78.00 16.01 119 1.939 108 3.275 119 10.530 81.6 182.1 10 97.8 2009 205 75500 75600 78.00 16.01 119 1.876 104 2.933 133 10.503 81.6 182.1 10 97.8 2009 205 75600 75700 78.00 16.01 119 2.098 108 3.170 119 10.562 81.6 182.1 10 97.7 2009 205 75700 75800 78.00 16.01 119 1.959 114 2.710 119 10.571 81.6 182.1 10 97.7 2009 205 75800 75900 78.00 16.01 119 1.937 104 3.114 125 10.504 81.6 182.1 10 97.7 2009 205 75900 80000 78.00 16.01 119 1.909 97 4.077 97 10.571 81.6 182.1 10 97.6 2009 205 80000 80100 78.00 16.01 119 1.936 100 3.383 100 10.581 81.6 182.1 10 97.6 2009 205 80100 80200 78.00 16.01 119 1.857 114 2.811 119 10.509 81.6 182.1 10 97.6 2009 205 80200 80300 78.00 16.01 119 1.788 113 2.609 113 10.481 81.6 182.1 10 97.5 2009 205 80300 80400 78.00 16.01 119 1.737 104 2.989 104 10.572 81.6 182.1 10 97.5 2009 205 80400 80500 78.00 16.01 119 1.893 100 3.055 100 10.569 81.6 182.1 10 97.5 2009 205 80500 80600 78.00 16.01 119 1.726 113 2.142 113 10.477 81.6 182.1 10 97.4 2009 205 80600 80636 78.00 16.01 119 1.071 114 1.115 133 10.326 81.6 182.1 10 97.4 2009 205 81312 81400 78.00 16.01 119 1.743 104 2.913 104 10.609 81.6 182.1 10 97.1 2009 205 81400 81500 78.00 16.01 119 1.578 108 2.540 108 10.484 81.6 182.1 10 97.1 2009 205 81500 81600 78.00 16.01 119 1.455 104 2.427 104 10.688 81.6 182.1 10 97.1 2009 205 81600 81700 78.00 16.01 119 1.227 113 1.358 141 10.361 81.6 182.1 10 97.0 2009 205 81700 81800 78.00 16.01 119 1.336 93 2.365 93 10.514 81.6 182.1 10 97.0 2009 205 81800 81900 78.00 16.01 119 1.304 104 1.999 133 10.356 81.6 182.1 10 97.0 2009 205 81900 82000 78.00 16.01 119 1.669 108 2.395 119 10.455 81.6 182.1 10 96.9 2009 205 82000 82100 78.00 16.01 125 1.682 113 2.712 125 10.483 81.6 182.1 10 96.9 2009 205 82100 82200 78.00 16.01 119 1.774 113 2.405 133 10.494 81.6 182.1 10 96.9 2009 205 82200 82300 78.00 16.01 119 1.948 114 2.789 125 10.548 81.6 182.1 10 96.8 2009 205 82300 82400 78.00 16.01 119 1.795 100 2.537 100 10.644 81.6 182.1 10 96.8 2009 205 82400 82448 78.00 16.01 119 1.621 108 1.735 125 10.474 81.6 182.1 10 96.8 2009 205 91012 91100 78.00 16.01 125 2.236 104 4.221 125 10.606 81.6 182.1 10 95.4 2009 205 91100 91200 78.00 16.01 125 1.838 100 4.908 100 10.755 81.6 182.1 10 95.4 2009 205 91200 91300 78.00 16.01 119 1.850 93 3.653 93 10.589 81.6 182.1 10 95.4 2009 205 91300 91400 78.00 16.01 119 1.773 108 4.276 108 10.643 81.6 182.1 10 95.3 2009 205 91400 91500 78.00 16.01 125 1.937 97 3.933 97 10.595 81.6 182.1 10 95.3 2009 205 91500 91600 78.00 16.01 119 2.261 93 4.328 125 10.612 81.6 182.1 10 95.3 2009 205 91600 91700 78.00 16.01 119 1.841 108 3.474 132 10.499 81.6 182.1 10 95.3 2009 205 91700 91800 78.00 16.01 119 1.916 97 3.900 97 10.512 81.6 182.1 10 95.2 2009 205 91800 91824 78.00 16.01 119 2.186 113 3.339 133 10.554 81.6 182.1 10 95.2 2009 205 92606 92700 78.00 16.01 125 1.358 104 2.298 133 10.377 81.6 182.1 10 95.0 2009 205 92700 92800 78.00 16.01 125 1.373 104 2.556 104 10.353 81.6 182.1 10 95.0 2009 205 92800 92900 78.00 16.01 119 1.550 104 2.507 104 10.600 81.6 182.1 10 95.0 2009 205 92900 93000 78.00 16.01 125 1.726 108 2.903 108 10.496 81.6 182.1 10 95.0 2009 205 93000 93100 78.00 16.01 125 2.185 108 4.603 108 10.616 81.6 182.1 10 95.0 2009 205 93100 93200 78.00 16.01 119 2.519 104 4.329 104 10.654 81.6 182.1 10 94.9 2009 205 93200 93300 78.00 16.01 119 2.082 104 3.576 104 10.621 81.6 182.1 10 94.9 2009 205 93300 93400 78.00 16.01 125 2.230 100 3.436 100 10.754 81.6 182.1 10 94.9 2009 205 93400 93500 78.00 16.01 125 1.905 97 3.933 97 10.912 81.6 182.1 10 94.9 2009 205 93500 93600 78.00 16.01 125 1.741 100 2.414 133 10.518 81.6 182.1 10 94.9 2009 205 93600 93700 78.00 16.01 125 1.910 97 3.713 97 10.801 81.6 182.1 10 94.8 2009 205 93700 93800 78.00 16.01 125 2.083 108 2.917 125 10.545 81.6 182.1 10 94.8 2009 205 93800 93900 78.00 16.01 125 2.199 100 3.753 100 10.628 81.6 182.1 10 94.8 2009 205 93900 94000 78.00 16.01 125 2.209 104 4.067 104 10.699 81.6 182.1 10 94.8 2009 205 94000 94100 78.00 16.01 119 2.150 97 5.014 97 10.872 81.6 182.1 10 94.8 2009 205 94100 94200 78.00 16.01 126 2.050 100 3.526 133 10.603 81.6 182.1 10 94.7 2009 205 94200 94300 78.00 16.01 119 2.419 100 5.369 100 11.157 81.6 182.1 10 94.7 2009 205 94300 94400 78.00 16.01 119 2.093 100 4.053 100 10.688 81.6 182.1 10 94.7 2009 205 94400 94500 78.00 16.01 119 2.174 97 5.629 97 10.832 81.6 182.1 10 94.7 2009 205 94500 94600 78.00 16.01 119 1.732 97 4.999 97 11.009 81.6 182.1 10 94.7 2009 205 94600 94700 78.00 16.01 113 2.827 93 6.913 93 11.122 81.6 182.1 10 94.6 2009 205 94700 94800 78.00 16.01 125 1.642 97 5.379 97 10.989 81.6 182.1 10 94.6 2009 205 94800 94900 78.00 16.01 119 2.098 100 4.130 100 10.763 81.6 182.1 10 94.6 2009 205 94900 95000 78.00 16.01 119 2.164 97 4.737 97 10.597 81.6 182.1 10 94.6 2009 205 95000 95100 78.00 16.01 125 1.951 100 4.334 100 10.604 81.6 182.1 10 94.6 2009 205 95100 95200 78.00 16.01 119 1.892 100 4.374 100 10.613 81.6 182.1 10 94.6 2009 205 95200 95300 78.00 16.01 119 1.649 100 4.170 100 10.829 81.6 182.1 10 94.5 2009 205 95300 95400 78.00 16.01 125 1.627 108 3.516 108 10.530 81.6 182.1 10 94.5 2009 205 95400 95500 78.00 16.01 126 1.470 100 3.250 100 10.494 81.6 182.1 10 94.5 2009 205 95500 95600 78.00 16.01 119 1.566 104 3.120 104 10.632 81.6 182.1 10 94.5 2009 205 95600 95700 78.00 16.01 119 1.785 97 4.275 97 10.808 81.6 182.1 10 94.5 2009 205 95700 95800 78.00 16.01 119 1.900 100 2.943 133 10.559 81.6 182.1 10 94.5 2009 205 95800 95900 78.00 16.01 125 2.011 104 3.175 104 10.611 81.6 182.1 10 94.4 2009 205 95900 100000 78.00 16.01 119 2.094 104 4.118 104 10.583 81.6 182.1 10 94.4 2009 205 100000 100100 78.00 16.01 125 2.204 97 5.025 97 10.724 81.6 182.1 10 94.4 2009 205 100100 100200 78.00 16.01 119 2.164 100 4.236 100 10.615 81.6 182.1 10 94.4 2009 205 100200 100300 78.00 16.01 125 2.039 100 4.601 100 10.689 81.6 182.1 10 94.4 2009 205 100300 100400 78.00 16.01 119 2.137 108 4.771 108 10.662 81.6 182.1 10 94.4 2009 205 100400 100500 78.00 16.01 125 1.810 108 3.407 108 10.569 81.6 182.1 10 94.4 2009 205 100500 100600 78.00 16.01 119 1.704 100 3.474 100 10.688 81.6 182.1 10 94.3 2009 205 100600 100700 78.00 16.01 125 1.913 100 4.526 100 10.710 81.6 182.1 10 94.3 2009 205 100700 100800 78.00 16.01 119 1.797 108 2.908 108 10.555 81.6 182.1 10 94.3 2009 205 100800 100900 78.00 16.01 119 1.662 97 4.047 97 10.898 81.6 182.1 10 94.3 2009 205 100900 101000 78.00 16.01 125 1.761 97 5.360 97 10.988 81.6 182.1 10 94.3 2009 205 101000 101100 78.00 16.01 125 1.599 108 3.047 108 10.535 81.6 182.1 10 94.3 2009 205 101100 101200 78.00 16.01 125 1.430 108 2.700 108 10.581 81.6 182.1 10 94.3 2009 205 101200 101300 78.00 16.01 125 1.330 104 1.479 133 10.370 81.6 182.1 10 94.2 2009 205 101300 101400 78.00 16.01 125 1.381 108 1.640 108 10.436 81.6 182.1 10 94.2 2009 205 101400 101500 78.00 16.01 125 1.496 104 2.453 104 10.544 81.6 182.1 10 94.2 2009 205 101500 101600 78.00 16.01 125 1.314 104 1.498 141 10.386 81.6 182.1 10 94.2 2009 205 101600 101700 78.00 16.01 125 1.395 108 1.370 125 10.418 81.6 182.1 10 94.2 2009 205 101700 101800 78.00 16.01 125 1.413 108 1.549 133 10.457 81.6 182.1 10 94.2 2009 205 101800 101900 78.00 16.01 125 1.366 104 2.119 104 10.480 81.6 182.1 10 94.2 2009 205 101900 102000 78.00 16.01 125 1.664 108 1.880 133 10.498 81.6 182.1 10 94.2 2009 205 102000 102100 78.00 16.01 125 1.738 93 2.652 125 10.522 81.6 182.1 10 94.2 2009 205 102100 102200 78.00 16.01 125 1.661 114 1.591 125 10.472 81.6 182.1 10 94.1 2009 205 102200 102300 78.00 16.01 125 1.346 108 1.268 141 10.412 81.6 182.1 10 94.1 2009 205 102300 102400 78.00 16.01 125 1.681 113 2.052 125 10.487 81.6 182.1 10 94.1 2009 205 102400 102500 78.00 16.01 125 1.795 108 2.035 125 10.512 81.6 182.1 10 94.1 2009 205 102500 102600 78.00 16.01 125 1.686 108 1.689 125 10.495 81.6 182.1 10 94.1 2009 205 102600 102700 78.00 16.01 125 1.637 108 1.862 125 10.523 81.6 182.1 10 94.1 2009 205 102700 102800 78.00 16.01 125 1.609 113 1.370 125 10.537 81.6 182.1 10 94.1 2009 205 102800 102900 78.00 16.01 119 1.589 114 1.710 125 10.482 81.6 182.1 10 94.1 2009 205 102900 103000 78.00 16.01 125 1.781 113 1.899 125 10.517 81.6 182.1 10 94.1 2009 205 103000 103100 78.00 16.01 119 1.858 113 2.137 125 10.525 81.6 182.1 10 94.1 2009 205 103100 103200 78.00 16.01 125 1.888 108 1.958 125 10.570 81.6 182.1 10 94.0 2009 205 103200 103300 78.00 16.01 125 1.743 113 1.554 133 10.559 81.6 182.1 10 94.0 2009 205 103300 103400 78.00 16.01 119 1.854 104 2.442 104 10.523 81.6 182.1 10 94.0 2009 205 103400 103500 78.00 16.01 125 1.747 113 1.583 125 10.570 81.6 182.1 10 94.0 2009 205 103500 103600 78.00 16.01 125 1.683 113 1.755 125 10.510 81.6 182.1 10 94.0 2009 205 103600 103700 78.00 16.01 119 1.646 114 1.873 125 10.452 81.6 182.1 10 94.0 2009 205 103700 103800 78.00 16.01 119 1.766 108 1.780 125 10.510 81.6 182.1 10 94.0 2009 205 103800 103900 78.00 16.01 125 2.015 113 2.080 125 10.579 81.6 182.1 10 94.0 2009 205 103900 104000 78.00 16.01 119 1.830 113 1.663 133 10.541 81.6 182.1 10 94.0 2009 205 104000 104100 78.00 16.01 125 1.715 108 1.652 125 10.545 81.6 182.1 10 94.0 2009 205 104100 104200 78.00 16.01 119 1.706 108 1.676 133 10.476 81.6 182.1 10 94.0 2009 205 104200 104300 78.00 16.01 119 1.823 108 2.273 108 10.594 81.6 182.1 10 94.0 2009 205 104300 104400 78.00 16.01 119 1.933 114 2.009 125 10.549 81.6 182.1 10 94.0 2009 205 104400 104500 78.00 16.01 119 1.571 104 1.629 133 10.447 81.6 182.1 10 94.0 2009 205 104500 104600 78.00 16.01 125 1.476 108 2.318 108 10.837 81.6 182.1 10 93.9 2009 205 104600 104700 78.00 16.01 119 1.717 104 2.004 104 10.571 81.6 182.1 10 93.9 2009 205 104700 104800 78.00 16.01 119 1.494 113 1.556 125 10.417 81.6 182.1 10 93.9 2009 205 104800 104900 78.00 16.01 119 1.690 97 2.268 133 10.439 81.6 182.1 10 93.9 2009 205 104900 105000 78.00 16.01 119 1.954 104 2.482 104 10.600 81.6 182.1 10 93.9 2009 205 105000 105100 78.00 16.01 125 1.865 113 1.905 125 10.537 81.6 182.1 10 93.9 2009 205 105100 105200 78.00 16.01 125 1.844 113 1.960 133 10.531 81.6 182.1 10 93.9 2009 205 105200 105300 78.00 16.01 119 1.712 113 1.458 125 10.481 81.6 182.1 10 93.9 2009 205 105300 105400 78.00 16.01 119 1.508 113 1.865 133 10.387 81.6 182.1 10 93.9 2009 205 105400 105500 78.00 16.01 119 1.261 113 0.982 142 10.365 81.6 182.1 10 93.9 2009 205 105500 105600 78.00 16.01 119 1.459 108 1.877 119 10.375 81.6 182.1 10 93.9 2009 205 105600 105700 78.00 16.01 125 1.557 104 1.577 125 10.479 81.6 182.1 10 93.9 2009 205 105700 105800 78.00 16.01 119 1.684 104 1.920 104 10.546 81.6 182.1 10 93.9 2009 205 105800 105900 78.00 16.01 119 1.740 119 1.587 125 10.508 81.6 182.1 10 93.9 2009 205 105900 110000 78.00 16.01 125 1.694 108 1.724 133 10.505 81.6 182.1 10 93.9 2009 205 110000 110100 78.00 16.01 125 1.634 114 1.630 133 10.494 81.6 182.1 10 93.9 2009 205 110100 110200 78.00 16.01 125 1.684 108 1.449 133 10.489 81.6 182.1 10 93.9 2009 205 110200 110300 78.00 16.01 119 1.775 113 1.727 125 10.527 81.6 182.1 10 93.9 2009 205 110300 110400 78.00 16.01 119 1.551 104 1.822 104 10.436 81.6 182.1 10 93.9 2009 205 110400 110500 78.00 16.01 119 1.792 104 2.171 104 10.730 81.6 182.1 10 93.9 2009 205 110500 110600 78.00 16.01 119 1.568 113 1.103 133 10.472 81.6 182.1 10 93.9 2009 205 110600 110700 78.00 16.01 119 1.859 104 2.457 119 10.541 81.6 182.1 10 93.9 2009 205 110700 110800 78.00 16.01 119 1.661 114 1.917 125 10.455 81.6 182.1 10 93.9 2009 205 110800 110900 78.00 16.01 119 1.742 108 2.031 133 10.523 81.6 182.1 10 93.9 2009 205 110900 111000 78.00 16.01 119 1.750 108 1.768 133 10.523 81.6 182.1 10 93.9 2009 205 111000 111100 78.00 16.01 119 1.634 113 1.574 133 10.452 81.6 182.1 10 93.9 2009 205 111100 111200 78.00 16.01 125 1.685 108 1.736 108 10.509 81.6 182.1 10 93.9 2009 205 111200 111300 78.00 16.01 119 1.668 104 2.118 104 10.498 81.6 182.1 10 93.9 2009 205 111300 111400 78.00 16.01 119 2.098 104 2.444 125 10.561 81.6 182.1 10 93.9 2009 205 111400 111500 78.00 16.01 119 2.125 104 2.613 119 10.581 81.6 182.1 10 93.9 2009 205 111500 111600 78.00 16.01 119 1.694 113 1.964 119 10.541 81.6 182.1 10 93.9 2009 205 111600 111700 78.00 16.01 119 1.918 108 3.274 108 10.748 81.6 182.1 10 93.9 2009 205 111700 111800 78.00 16.01 119 1.538 104 1.833 104 10.682 81.6 182.1 10 93.9 2009 205 111800 111900 78.00 16.01 125 1.535 108 1.698 125 10.423 81.6 182.1 10 93.9 2009 205 111900 112000 78.00 16.01 119 1.909 114 1.737 125 10.543 81.6 182.1 10 93.9 2009 205 112000 112100 78.00 16.01 119 1.586 113 1.710 113 10.436 81.6 182.1 10 93.9 2009 205 112100 112200 78.00 16.01 119 1.457 104 1.667 104 10.391 81.6 182.1 10 93.9 2009 205 112200 112300 78.00 16.01 119 1.776 108 1.598 133 10.474 81.6 182.1 10 93.9 2009 205 112300 112400 78.00 16.01 119 1.688 104 2.112 119 10.429 81.6 182.1 10 93.9 2009 205 112400 112500 78.00 16.01 119 1.716 108 1.951 141 10.467 81.6 182.1 10 93.9 2009 205 112500 112600 78.00 16.01 119 2.085 108 3.005 108 10.705 81.6 182.1 10 93.9 2009 205 112600 112700 78.00 16.01 125 1.754 114 1.717 132 10.491 81.6 182.1 10 93.9 2009 205 112700 112800 78.00 16.01 119 2.031 104 2.506 104 10.592 81.6 182.1 10 93.9 2009 205 112800 112900 78.00 16.01 119 1.852 104 2.116 119 10.541 81.6 182.1 10 93.9 2009 205 112900 113000 78.00 16.01 119 1.370 114 1.210 119 10.376 81.6 182.1 10 93.9 2009 205 113000 113100 78.00 16.01 119 1.734 114 1.979 114 10.506 81.6 182.1 10 93.9 2009 205 113100 113200 78.00 16.01 119 1.716 104 1.945 104 10.630 81.6 182.1 10 93.9 2009 205 113200 113300 78.00 16.01 125 1.493 113 1.084 125 10.487 81.6 182.1 10 93.9 2009 205 113300 113400 78.00 16.01 119 1.799 108 2.061 125 10.485 81.6 182.1 10 93.9 2009 205 113400 113500 78.00 16.01 119 1.502 104 2.070 104 10.555 81.6 182.1 10 93.9 2009 205 113500 113600 78.00 16.01 125 1.681 108 2.100 108 10.481 81.6 182.1 10 93.9 2009 205 113600 113700 78.00 16.01 125 1.595 108 1.945 125 10.481 81.6 182.1 10 93.9 2009 205 113700 113800 78.00 16.01 125 1.709 113 1.712 125 10.499 81.6 182.1 10 94.0 2009 205 113800 113900 78.00 16.01 119 1.683 113 1.780 119 10.450 81.6 182.1 10 94.0 2009 205 113900 114000 78.00 16.01 119 1.521 114 1.607 119 10.450 81.6 182.1 10 94.0 2009 205 114000 114100 78.00 16.01 119 1.656 113 1.726 119 10.462 81.6 182.1 10 94.0 2009 205 114100 114200 78.00 16.01 119 1.860 114 1.811 119 10.538 81.6 182.1 10 94.0 2009 205 114200 114300 78.00 16.01 119 1.407 113 1.468 119 10.370 81.6 182.1 10 94.0 2009 205 114300 114400 78.00 16.01 119 2.018 113 2.361 119 10.571 81.6 182.1 10 94.0 2009 205 114400 114500 78.00 16.01 119 1.856 113 2.741 113 10.570 81.6 182.1 10 94.0 2009 205 114500 114600 78.00 16.01 119 1.381 113 1.685 133 10.316 81.6 182.1 10 94.0 2009 205 114600 114700 78.00 16.01 119 1.320 104 1.472 119 10.325 81.6 182.1 10 94.0 2009 205 114700 114800 78.00 16.01 125 1.250 113 1.120 125 10.367 81.6 182.1 10 94.0 2009 205 114800 114900 78.00 16.01 119 1.590 108 1.754 108 10.574 81.6 182.1 10 94.0 2009 205 114900 115000 78.00 16.01 119 1.469 108 1.479 125 10.405 81.6 182.1 10 94.0 2009 205 115000 115100 78.00 16.01 119 1.649 104 1.602 125 10.459 81.6 182.1 10 94.0 2009 205 115100 115200 78.00 16.01 125 1.803 104 1.872 125 10.550 81.6 182.1 10 94.1 2009 205 115200 115300 78.00 16.01 119 2.017 108 2.941 108 10.751 81.6 182.1 10 94.1 2009 205 115300 115400 78.00 16.01 119 1.659 108 1.577 119 10.490 81.6 182.1 10 94.1 2009 205 115400 115500 78.00 16.01 119 1.790 108 2.099 125 10.509 81.6 182.1 10 94.1 2009 205 115500 115600 78.00 16.01 119 1.686 108 2.027 125 10.421 81.6 182.1 10 94.1 2009 205 115600 115700 78.00 16.01 119 1.487 113 1.295 119 10.404 81.6 182.1 10 94.1 2009 205 115700 115800 78.00 16.01 119 1.965 108 2.634 108 10.603 81.6 182.1 10 94.1 2009 205 115800 115900 78.00 16.01 119 1.663 113 1.612 119 10.469 81.6 182.1 10 94.1 2009 205 115900 120000 78.00 16.01 119 1.434 114 1.087 119 10.490 81.6 182.1 10 94.1 2009 205 120000 120100 78.00 16.01 119 1.639 113 1.589 125 10.431 81.6 182.1 13 94.1 2009 205 120100 120200 78.00 16.01 119 1.552 119 1.364 125 10.437 81.6 182.1 13 94.1 2009 205 120200 120300 78.00 16.01 119 1.502 113 1.404 119 10.427 81.6 182.1 13 94.2 2009 205 120300 120400 78.00 16.01 119 1.459 104 1.440 133 10.401 81.6 182.1 13 94.2 2009 205 120400 120500 78.00 16.01 119 1.244 113 1.242 125 10.284 81.6 182.1 13 94.2 2009 205 120500 120600 78.00 16.01 119 1.356 113 1.182 141 10.367 81.6 182.1 13 94.2 2009 205 120600 120700 78.00 16.01 119 0.919 104 0.785 104 10.295 81.6 182.1 13 94.2 2009 205 120700 120800 78.00 16.01 125 1.352 113 0.749 141 10.495 81.6 182.1 13 94.2 2009 205 120800 120900 78.00 16.01 125 1.501 108 1.197 133 10.494 81.6 182.1 13 94.2 2009 205 120900 121000 78.00 16.01 125 1.538 108 1.521 142 10.463 81.6 182.1 13 94.2 2009 205 121000 121100 78.00 16.01 125 1.923 104 1.550 133 10.577 81.6 182.1 13 94.3 2009 205 121100 121200 78.00 16.01 119 1.828 119 1.646 133 10.543 81.6 182.1 13 94.3 2009 205 121200 121300 78.00 16.01 125 1.860 104 1.641 132 10.535 81.6 182.1 13 94.3 2009 205 121300 121400 78.00 16.01 119 2.094 104 2.273 125 10.523 81.6 182.1 13 94.3 2009 205 121400 121500 78.00 16.01 119 1.834 113 1.144 133 10.538 81.6 182.1 13 94.3 2009 205 121500 121600 78.00 16.01 125 1.820 104 1.431 133 10.548 81.6 182.1 13 94.3 2009 205 121600 121700 78.00 16.01 125 1.707 114 1.333 133 10.501 81.6 182.1 13 94.3 2009 205 121700 121800 78.00 16.01 125 1.608 113 1.133 141 10.533 81.6 182.1 13 94.3 2009 205 121800 121900 78.00 16.01 125 1.786 119 1.299 141 10.511 81.6 182.1 13 94.4 2009 205 121900 122000 78.00 16.01 119 1.729 113 1.536 141 10.497 81.6 182.1 13 94.4 2009 205 122000 122100 78.00 16.01 125 1.922 108 1.576 132 10.576 81.6 182.1 13 94.4 2009 205 122100 122200 78.00 16.01 125 1.598 113 1.156 132 10.500 81.6 182.1 13 94.4 2009 205 122200 122300 78.00 16.01 119 1.541 104 1.119 132 10.503 81.6 182.1 13 94.4 2009 205 122300 122400 78.00 16.01 119 1.424 93 1.286 142 10.434 81.6 182.1 13 94.4 2009 205 122400 122500 78.00 16.01 119 1.373 104 1.333 133 10.384 81.6 182.1 13 94.5 2009 205 122500 122600 78.00 16.01 119 1.621 93 1.350 132 10.484 81.6 182.1 13 94.5 2009 205 122600 122700 78.00 16.01 119 1.727 119 1.407 133 10.525 81.6 182.1 13 94.5 2009 205 122700 122800 78.00 16.01 125 2.041 108 1.930 125 10.560 81.6 182.1 13 94.5 2009 205 122800 122900 78.00 16.01 119 1.894 119 1.359 133 10.531 81.6 182.1 13 94.5 2009 205 122900 123000 78.00 16.01 125 1.463 119 0.945 141 10.480 81.6 182.1 13 94.5 2009 205 123000 123100 78.00 16.01 125 1.489 119 0.941 133 10.511 81.6 182.1 13 94.5 2009 205 123100 123200 78.00 16.01 125 1.330 108 0.885 132 10.437 81.6 182.1 13 94.6 2009 205 123200 123300 78.00 16.01 125 1.309 119 0.912 141 10.443 81.6 182.1 13 94.6 2009 205 123300 123400 78.00 16.01 125 1.440 119 0.919 125 10.444 81.6 182.1 13 94.6 2009 205 123400 123500 78.00 16.01 119 1.406 119 0.910 133 10.457 81.6 182.1 13 94.6 2009 205 123500 123600 78.00 16.01 125 1.292 119 0.851 125 10.449 81.6 182.1 13 94.6 2009 205 123600 123700 78.00 16.01 125 1.495 119 1.017 125 10.443 81.6 182.1 13 94.7 2009 205 123700 123800 78.00 16.01 125 1.664 104 1.592 125 10.510 81.6 182.1 13 94.7 2009 205 123800 123900 78.00 16.01 125 1.422 114 1.117 141 10.460 81.6 182.1 13 94.7 2009 205 123900 124000 78.00 16.01 125 1.285 108 1.038 133 10.401 81.6 182.1 13 94.7 2009 205 124000 124100 78.00 16.01 125 1.537 119 1.031 141 10.480 81.6 182.1 13 94.7 2009 205 124100 124200 78.00 16.01 125 1.687 119 1.169 133 10.532 81.6 182.1 13 94.7 2009 205 124200 124300 78.00 16.01 125 1.612 119 1.112 133 10.525 81.6 182.1 13 94.8 2009 205 124300 124400 78.00 16.01 125 1.597 119 1.025 125 10.519 81.6 182.1 13 94.8 2009 205 124400 124500 78.00 16.01 125 1.880 119 1.466 125 10.548 81.6 182.1 13 94.8 2009 205 124500 124600 78.00 16.01 119 1.774 108 1.670 125 10.496 81.6 182.1 13 94.8 2009 205 124600 124700 78.00 16.01 119 1.699 82 1.592 141 10.542 81.6 182.1 13 94.8 2009 205 124700 124800 78.00 16.01 125 1.658 104 1.331 141 10.553 81.6 182.1 13 94.9 2009 205 124800 124900 78.00 16.01 125 2.383 113 1.864 125 10.665 81.6 182.1 13 94.9 2009 205 124900 125000 78.00 16.01 119 3.050 113 2.551 133 10.723 81.6 182.1 13 94.9 2009 205 125000 125100 78.00 16.01 119 2.738 113 2.345 119 10.702 81.6 182.1 13 94.9 2009 205 125100 125200 78.00 16.01 125 1.665 113 1.519 141 10.475 81.6 182.1 13 94.9 2009 205 125200 125300 78.00 16.01 125 1.576 104 1.438 141 10.475 81.6 182.1 13 95.0 2009 205 125300 125400 78.00 16.01 119 2.121 114 1.656 133 10.621 81.6 182.1 13 95.0 2009 205 125400 125500 78.00 16.01 119 2.541 114 2.494 132 10.681 81.6 182.1 13 95.0 2009 205 125500 125600 78.00 16.01 119 2.481 114 2.340 125 10.635 81.6 182.1 13 95.0 2009 205 125600 125700 78.00 16.01 119 2.593 113 2.249 133 10.635 81.6 182.1 13 95.1 2009 205 125700 125800 78.00 16.01 119 2.473 114 2.073 133 10.620 81.6 182.1 13 95.1 2009 205 125800 125900 78.00 16.01 125 2.506 113 2.221 133 10.727 81.6 182.1 13 95.1 2009 205 125900 130000 78.00 16.01 119 2.866 114 2.623 126 10.712 81.6 182.1 13 95.1 2009 205 130000 130100 78.00 16.01 119 2.269 119 1.522 141 10.614 81.6 182.1 13 95.1 2009 205 130100 130200 78.00 16.01 119 2.176 113 2.041 141 10.582 81.6 182.1 13 95.2 2009 205 130200 130300 78.00 16.01 119 2.019 119 1.433 133 10.576 81.6 182.1 13 95.2 2009 205 130300 130400 78.00 16.01 125 2.241 113 2.052 125 10.597 81.6 182.1 13 95.2 2009 205 130400 130500 78.00 16.01 119 2.326 113 2.163 133 10.613 81.6 182.1 13 95.2 2009 205 130500 130600 78.00 16.01 119 2.157 114 2.009 119 10.564 81.6 182.1 13 95.3 2009 205 130600 130700 78.00 16.01 119 1.779 113 1.888 133 10.504 81.6 182.1 13 95.3 2009 205 130700 130800 78.00 16.01 119 1.599 113 1.209 141 10.494 81.6 182.1 13 95.3 2009 205 130800 130900 78.00 16.01 125 1.597 119 1.052 133 10.530 81.6 182.1 13 95.3 2009 205 130900 131000 78.00 16.01 119 1.396 119 0.969 133 10.422 81.6 182.1 13 95.4 2009 205 131000 131100 78.00 16.01 125 1.254 108 1.080 125 10.371 81.6 182.1 13 95.4 2009 205 131100 131200 78.00 16.01 119 1.290 108 1.136 142 10.426 81.6 182.1 13 95.4 2009 205 131200 131300 78.00 16.01 125 1.229 108 0.849 125 10.419 81.6 182.1 13 95.4 2009 205 131300 131400 78.00 16.01 119 1.641 113 1.507 132 10.511 81.6 182.1 13 95.5 2009 205 131400 131500 78.00 16.01 119 1.808 113 1.689 119 10.489 81.6 182.1 13 95.5 2009 205 131500 131600 78.00 16.01 125 1.714 104 1.847 125 10.507 81.6 182.1 13 95.5 2009 205 131600 131700 78.00 16.01 125 0.248 100 0.307 141 9.686 81.6 182.1 13 95.5 2009 205 131700 131800 78.00 16.01 119 1.679 114 1.588 141 10.467 81.6 182.1 13 95.6 2009 205 131800 131900 78.00 16.01 125 1.620 114 1.305 125 10.493 81.6 182.1 13 95.6 2009 205 131900 132000 78.00 16.01 119 1.771 108 1.480 141 10.523 81.6 182.1 13 95.6 2009 205 132000 132100 78.00 16.01 125 1.576 104 1.639 125 10.431 81.6 182.1 13 95.6 2009 205 132100 132200 78.00 16.01 119 1.795 119 1.470 133 10.541 81.6 182.1 13 95.7 2009 205 132200 132300 78.00 16.01 119 2.199 113 1.958 125 10.592 81.6 182.1 13 95.7 2009 205 132300 132400 78.00 16.01 125 2.164 108 2.496 108 10.603 81.6 182.1 13 95.7 2009 205 132400 132500 78.00 16.01 126 1.427 108 1.305 133 10.472 81.6 182.1 13 95.7 2009 205 132500 132600 78.00 16.01 125 1.828 113 1.433 132 10.564 81.6 182.1 13 95.8 2009 205 132600 132700 78.00 16.01 119 2.251 113 1.995 133 10.608 81.6 182.1 13 95.8 2009 205 132700 132800 78.00 16.01 119 1.877 114 1.662 133 10.478 81.6 182.1 13 95.8 2009 205 132800 132900 78.00 16.01 125 1.870 104 2.062 104 10.527 81.6 182.1 13 95.9 2009 205 132900 133000 78.00 16.01 119 2.260 113 1.944 125 10.592 81.6 182.1 13 95.9 2009 205 133000 133100 78.00 16.01 119 2.033 113 1.832 133 10.570 81.6 182.1 13 95.9 2009 205 133100 133200 78.00 16.01 119 1.845 104 1.700 125 10.487 81.6 182.1 13 95.9 2009 205 133200 133300 78.00 16.01 125 1.769 104 2.065 104 10.519 81.6 182.1 13 96.0 2009 205 133300 133400 78.00 16.01 119 1.506 104 1.531 141 10.413 81.6 182.1 13 96.0 2009 205 133400 133500 78.00 16.01 125 1.528 119 1.124 125 10.465 81.6 182.1 13 96.0 2009 205 133500 133600 78.00 16.01 119 1.966 104 1.973 125 10.551 81.6 182.1 13 96.1 2009 205 133600 133700 78.00 16.01 119 2.086 114 2.325 125 10.561 81.6 182.1 13 96.1 2009 205 133700 133800 78.00 16.01 119 1.791 113 1.869 119 10.467 81.6 182.1 13 96.1 2009 205 133800 133900 78.00 16.01 125 1.562 108 1.963 108 10.453 81.6 182.1 13 96.1 2009 205 133900 134000 78.00 16.01 119 1.662 119 1.458 125 10.487 81.6 182.1 13 96.2 2009 205 134000 134100 78.00 16.01 125 2.009 104 2.057 125 10.591 81.6 182.1 13 96.2 2009 205 134100 134200 78.00 16.01 119 2.073 119 1.812 125 10.590 81.6 182.1 13 96.2 2009 205 134200 134300 78.00 16.01 119 1.868 104 1.845 141 10.506 81.6 182.1 13 96.3 2009 205 134300 134400 78.00 16.01 119 1.622 104 1.457 104 10.507 81.6 182.1 13 96.3 2009 205 134400 134500 78.00 16.01 119 1.571 108 2.023 141 10.496 81.6 182.1 13 96.3 2009 205 134500 134600 78.00 16.01 125 1.397 104 1.411 132 10.413 81.6 182.1 13 96.4 2009 205 134600 134700 78.00 16.01 119 1.655 114 1.514 125 10.463 81.6 182.1 13 96.4 2009 205 134700 134800 78.00 16.01 119 2.151 113 2.631 125 10.547 81.6 182.1 13 96.4 2009 205 134800 134900 78.00 16.01 119 2.125 113 2.397 125 10.546 81.6 182.1 13 96.4 2009 205 134900 135000 78.00 16.01 119 2.327 113 2.225 133 10.592 81.6 182.1 13 96.5 2009 205 135000 135100 78.00 16.01 119 2.514 114 2.386 119 10.630 81.6 182.1 13 96.5 2009 205 135100 135200 78.00 16.01 119 2.723 113 2.727 125 10.664 81.6 182.1 13 96.5 2009 205 135200 135300 78.00 16.01 125 2.302 113 2.470 133 10.619 81.6 182.1 13 96.6 2009 205 135300 135400 78.00 16.01 119 2.299 113 2.368 133 10.611 81.6 182.1 13 96.6 2009 205 135400 135500 78.00 16.01 119 2.235 113 2.226 141 10.564 81.6 182.1 13 96.6 2009 205 135500 135600 78.00 16.01 119 2.057 113 2.211 119 10.550 81.6 182.1 13 96.7 2009 205 135600 135700 78.00 16.01 125 2.319 113 2.075 125 10.648 81.6 182.1 13 96.7 2009 205 135700 135800 78.00 16.01 125 2.341 119 1.812 125 10.629 81.6 182.1 13 96.7 2009 205 135800 135900 78.00 16.01 125 2.146 119 1.611 125 10.623 81.6 182.1 13 96.8 2009 205 135900 140000 78.00 16.01 125 2.466 108 2.348 133 10.682 81.6 182.1 13 96.8 2009 205 140000 140100 78.00 16.01 125 2.488 119 2.385 125 10.697 81.6 182.1 13 96.8 2009 205 140100 140200 78.00 16.01 119 2.585 119 2.333 125 10.672 81.6 182.1 13 96.9 2009 205 140200 140300 78.00 16.01 125 2.641 119 2.192 133 10.713 81.6 182.1 13 96.9 2009 205 140300 140400 78.00 16.01 125 2.276 119 1.518 141 10.641 81.6 182.1 13 96.9 2009 205 140400 140500 78.00 16.01 125 2.833 113 2.813 125 10.744 81.6 182.1 13 97.0 2009 205 140500 140600 78.00 16.01 119 2.911 104 3.852 125 10.681 81.6 182.1 13 97.0 2009 205 140600 140700 78.00 16.01 119 2.506 108 2.634 125 10.646 81.6 182.1 13 97.0 2009 205 140700 140800 78.00 16.01 119 2.697 119 2.804 125 10.701 81.6 182.1 13 97.1 2009 205 140800 140900 78.00 16.01 119 2.791 100 2.999 119 10.702 81.6 182.1 13 97.1 2009 205 140900 141000 78.00 16.01 125 2.355 108 2.152 132 10.683 81.6 182.1 13 97.1 2009 205 141000 141100 78.00 16.01 125 2.520 119 2.159 125 10.692 81.6 182.1 13 97.2 2009 205 141100 141200 78.00 16.01 125 2.110 119 1.791 141 10.624 81.6 182.1 13 97.2 2009 205 141200 141300 78.00 16.01 125 2.419 104 2.294 141 10.687 81.6 182.1 13 97.3 2009 205 141300 141400 78.00 16.01 125 2.538 113 1.868 141 10.700 81.6 182.1 13 97.3 2009 205 141400 141500 78.00 16.01 125 2.716 119 2.026 133 10.776 81.6 182.1 13 97.3 2009 205 141500 141600 78.00 16.01 125 3.680 104 3.365 125 10.879 81.6 182.1 13 97.4 2009 205 141600 141700 78.00 16.01 125 3.427 113 2.797 133 10.835 81.6 182.1 13 97.4 2009 205 141700 141800 78.00 16.01 125 2.947 114 2.143 125 10.768 81.6 182.1 13 97.4 2009 205 141800 141900 78.00 16.01 125 2.997 108 2.826 141 10.752 81.6 182.1 13 97.5 2009 205 141900 142000 78.00 16.01 125 2.946 113 2.388 133 10.767 81.6 182.1 13 97.5 2009 205 142000 142100 78.00 16.01 125 2.655 119 2.347 125 10.708 81.6 182.1 13 97.5 2009 205 142100 142200 78.00 16.01 125 3.011 114 2.917 125 10.755 81.6 182.1 13 97.6 2009 205 142200 142300 78.00 16.01 119 2.809 113 2.559 126 10.700 81.6 182.1 13 97.6 2009 205 142300 142400 78.00 16.01 119 2.821 104 2.757 132 10.733 81.6 182.1 13 97.6 2009 205 142400 142500 78.00 16.01 125 2.574 113 2.335 133 10.698 81.6 182.1 13 97.7 2009 205 142500 142600 78.00 16.01 119 2.794 113 3.318 125 10.704 81.6 182.1 13 97.7 2009 205 142600 142700 78.00 16.01 125 2.645 113 2.269 132 10.710 81.6 182.1 13 97.8 2009 205 142700 142800 78.00 16.01 125 2.540 113 1.689 133 10.729 81.6 182.1 13 97.8 2009 205 142800 142900 78.00 16.01 125 2.650 114 1.918 133 10.728 81.6 182.1 13 97.8 2009 205 142900 143000 78.00 16.01 125 2.986 104 2.663 132 10.768 81.6 182.1 13 97.9 2009 205 143000 143100 78.00 16.01 119 3.079 119 2.373 125 10.758 81.6 182.1 13 97.9 2009 205 143100 143200 78.00 16.01 119 2.807 119 2.241 133 10.756 81.6 182.1 13 97.9 2009 205 143200 143300 78.00 16.01 125 3.280 119 2.670 132 10.819 81.6 182.1 13 98.0 2009 205 143300 143400 78.00 16.01 125 2.739 119 2.063 125 10.749 81.6 182.1 13 98.0 2009 205 143400 143500 78.00 16.01 125 2.345 108 2.412 142 10.648 81.6 182.1 13 98.1 2009 205 143500 143600 78.00 16.01 78 3.054 78 3.645 133 10.700 81.6 182.1 13 98.1 2009 205 143600 143700 78.00 16.01 119 2.769 119 2.165 133 10.746 81.6 182.1 13 98.1 2009 205 143700 143800 78.00 16.01 125 2.836 119 1.805 133 10.770 81.6 182.1 13 98.2 2009 205 143800 143818 78.00 16.01 125 2.876 113 2.052 141 10.788 81.6 182.1 13 98.2 2009 205 144818 144900 78.00 16.01 125 2.942 113 2.363 133 10.760 81.6 182.1 13 98.6 2009 205 144900 145000 78.00 16.01 125 3.025 113 2.418 132 10.793 81.6 182.1 13 98.7 2009 205 145000 145100 78.00 16.01 125 2.445 104 1.830 133 10.702 81.6 182.1 13 98.7 2009 205 145100 145200 78.00 16.01 125 2.812 119 2.073 141 10.773 81.6 182.1 13 98.7 2009 205 145200 145300 78.00 16.01 125 3.129 119 2.516 125 10.803 81.6 182.1 13 98.8 2009 205 145300 145400 78.00 16.01 125 3.231 119 2.269 133 10.810 81.6 182.1 13 98.8 2009 205 145400 145500 78.00 16.01 125 3.066 114 2.689 133 10.817 81.6 182.1 13 98.9 2009 205 145500 145600 78.00 16.01 125 3.259 104 3.085 133 10.803 81.6 182.1 13 98.9 2009 205 145600 145700 78.00 16.01 119 3.578 119 3.226 133 10.839 81.6 182.1 13 98.9 2009 205 145700 145800 78.00 16.01 119 3.256 86 3.286 133 10.793 81.6 182.1 13 99.0 2009 205 145800 145900 78.00 16.01 119 2.959 104 2.782 133 10.736 81.6 182.1 13 99.0 2009 205 145900 150000 78.00 16.01 125 2.589 113 1.593 133 10.727 81.6 182.1 13 99.1 2009 205 150000 150100 78.00 16.01 125 2.976 119 2.651 133 10.783 81.6 182.1 7 99.1 2009 205 150100 150200 78.00 16.01 125 2.541 119 1.976 133 10.708 81.6 182.1 7 99.2 2009 205 150200 150242 78.00 16.01 119 2.154 108 1.931 132 10.652 81.6 182.1 7 99.2 2009 205 150636 150700 78.00 16.01 119 3.206 114 2.712 125 10.781 81.6 182.1 7 99.4 2009 205 150700 150800 78.00 16.01 119 2.613 119 2.300 125 10.654 81.6 182.1 7 99.4 2009 205 150800 150900 78.00 16.01 119 2.557 113 2.308 133 10.653 81.6 182.1 7 99.5 2009 205 150900 151000 78.00 16.01 119 1.907 119 1.191 141 10.591 81.6 182.1 7 99.5 2009 205 151000 151100 78.00 16.01 119 2.171 113 2.074 141 10.610 81.6 182.1 7 99.5 2009 205 151100 151200 78.00 16.01 119 1.664 119 1.292 132 10.463 81.6 182.1 7 99.6 2009 205 151200 151300 78.00 16.01 125 2.472 119 1.347 141 10.795 81.6 182.1 7 99.6 2009 205 151300 151400 78.00 16.01 125 3.713 119 3.293 125 10.867 81.6 182.1 7 99.7 2009 205 151400 151500 78.00 16.01 119 3.536 108 3.583 125 10.794 81.6 182.1 7 99.7 2009 205 151500 151600 78.00 16.01 125 2.935 104 2.776 125 10.740 81.6 182.1 7 99.8 2009 205 151600 151700 78.00 16.01 119 2.425 108 2.205 125 10.602 81.6 182.1 7 99.8 2009 205 151700 151800 78.00 16.01 125 2.102 114 1.570 125 10.605 81.6 182.1 7 99.8 2009 205 151800 151900 78.00 16.01 125 1.880 113 1.082 133 10.583 81.6 182.1 7 99.9 2009 205 151900 152000 78.00 16.01 125 2.157 108 2.243 141 10.633 81.6 182.1 7 99.9 2009 205 152000 152100 78.00 16.01 125 2.274 108 1.945 141 10.626 81.6 182.1 7 100.0 2009 205 152100 152200 78.00 16.01 125 2.361 113 1.540 133 10.691 81.6 182.1 7 100.0 2009 205 152200 152300 78.00 16.01 119 2.742 104 2.151 133 10.710 81.6 182.1 7 100.1 2009 205 152300 152400 78.00 16.01 119 3.487 100 5.388 100 10.952 81.6 182.1 7 100.1 2009 205 152400 152500 78.00 16.01 125 2.860 119 2.259 141 10.712 81.6 182.1 7 100.2 2009 205 152500 152600 78.00 16.01 125 2.715 108 2.424 133 10.689 81.6 182.1 7 100.2 2009 205 152600 152700 78.00 16.01 125 2.597 113 1.580 133 10.684 81.6 182.1 7 100.2 2009 205 152700 152800 78.00 16.01 125 2.535 119 1.493 141 10.722 81.6 182.1 7 100.3 2009 205 152800 152900 78.00 16.01 125 2.734 119 1.274 141 10.716 81.6 182.1 7 100.3 2009 205 152900 153000 78.00 16.01 125 2.303 113 1.230 141 10.654 81.6 182.1 7 100.4 2009 205 153000 153100 78.00 16.01 125 1.360 89 0.569 141 10.550 81.6 182.1 7 100.4 2009 205 153100 153200 78.00 16.01 125 1.525 93 1.191 141 10.572 81.6 182.1 7 100.5 2009 205 153200 153300 78.00 16.01 125 1.865 93 1.023 142 10.557 81.6 182.1 7 100.5 2009 205 153300 153400 78.00 16.01 125 2.600 113 1.357 141 10.713 81.6 182.1 7 100.6 2009 205 153400 153500 78.00 16.01 119 2.556 108 1.656 141 10.735 81.6 182.1 7 100.6 2009 205 153500 153600 78.00 16.01 125 1.779 93 0.992 142 10.571 81.6 182.1 7 100.7 2009 205 153600 153700 78.00 16.01 125 1.775 108 1.537 141 10.552 81.6 182.1 7 100.7 2009 205 153700 153800 78.00 16.01 125 1.691 113 0.785 141 10.624 81.6 182.1 7 100.7 2009 205 153800 153900 78.00 16.01 125 2.182 108 1.648 142 10.578 81.6 182.1 7 100.8 2009 205 153900 154000 78.00 16.01 125 2.427 108 2.258 141 10.681 81.6 182.1 7 100.8 2009 205 154000 154100 78.00 16.01 126 2.687 119 2.250 126 10.702 81.6 182.1 7 100.9 2009 205 154100 154200 78.00 16.01 118 1.985 108 1.974 141 10.548 81.6 182.1 7 100.9 2009 205 154200 154300 78.00 16.01 119 1.102 113 0.765 142 10.443 81.6 182.1 7 101.0 2009 205 154300 154400 78.00 16.01 125 1.520 119 1.144 142 10.537 81.6 182.1 7 101.0 2009 205 154400 154500 78.00 16.01 125 1.898 119 1.081 141 10.631 81.6 182.1 7 101.1 2009 205 154500 154600 78.00 16.01 125 1.897 113 1.001 141 10.602 81.6 182.1 7 101.1 2009 205 154600 154700 78.00 16.01 125 2.034 119 1.041 133 10.572 81.6 182.1 7 101.2 2009 205 154700 154800 78.00 16.01 125 2.427 108 1.474 141 10.707 81.6 182.1 7 101.2 2009 205 154800 154900 78.00 16.01 125 2.060 119 1.015 141 10.614 81.6 182.1 7 101.3 2009 205 154900 155000 78.00 16.01 125 1.672 108 0.991 133 10.495 81.6 182.1 7 101.3 2009 205 155000 155100 78.00 16.01 125 1.140 93 0.643 141 10.358 81.6 182.1 7 101.4 2009 205 155100 155200 78.00 16.01 125 1.461 119 0.740 141 10.516 81.6 182.1 7 101.4 2009 205 155200 155300 78.00 16.01 125 1.524 108 1.035 141 10.458 81.6 182.1 7 101.4 2009 205 155300 155400 78.00 16.01 125 1.034 119 0.439 141 10.394 81.6 182.1 7 101.5 2009 205 155400 155500 78.00 16.01 125 1.382 108 0.825 133 10.467 81.6 182.1 7 101.5 2009 205 155500 155600 78.00 16.01 125 1.374 93 0.940 141 10.403 81.6 182.1 7 101.6 2009 205 155600 155700 78.00 16.01 125 1.190 119 0.896 125 10.334 81.6 182.1 7 101.6 2009 205 155700 155800 78.00 16.01 114 0.995 93 1.468 93 10.352 81.6 182.1 7 101.7 2009 205 155800 155900 78.00 16.01 125 1.235 114 0.719 125 10.333 81.6 182.1 7 101.7 2009 205 155900 160000 78.00 16.01 125 1.367 113 1.304 133 10.358 81.6 182.1 7 101.8 2009 205 160000 160100 78.00 16.01 125 1.000 104 1.006 141 10.197 81.6 182.1 7 101.8 2009 205 160100 160200 78.00 16.01 125 1.047 108 0.928 141 10.365 81.6 182.1 7 101.9 2009 205 160200 160300 78.00 16.01 132 2.643 108 1.596 141 10.767 81.6 182.1 7 101.9 2009 205 160300 160400 78.00 16.01 125 3.655 113 2.448 125 10.754 81.6 182.1 7 102.0 2009 205 160400 160500 78.00 16.01 125 2.674 93 1.468 141 10.686 81.6 182.1 7 102.0 2009 205 160500 160600 78.00 16.01 125 1.676 108 1.143 141 10.450 81.6 182.1 7 102.1 2009 205 160600 160700 78.00 16.01 119 0.840 108 0.501 141 10.292 81.6 182.1 7 102.1 2009 205 160700 160800 78.00 16.01 125 0.982 113 0.565 141 10.246 81.6 182.1 7 102.2 2009 205 160800 160854 78.00 16.01 125 0.641 89 0.381 125 10.269 81.6 182.1 7 102.2 2009 205 161624 161700 78.00 16.01 133 1.324 108 0.971 142 10.442 81.6 182.1 7 102.6 2009 205 161700 161800 78.00 16.01 125 1.158 104 0.606 141 10.411 81.6 182.1 7 102.7 2009 205 161800 161900 78.00 16.01 133 0.892 93 0.655 133 10.373 81.6 182.1 7 102.7 2009 205 161900 162000 78.00 16.01 125 0.730 108 0.571 108 10.248 81.6 182.1 7 102.8 2009 205 162000 162100 78.00 16.01 141 0.642 108 0.717 141 10.224 81.6 182.1 7 102.8 2009 205 162100 162200 78.00 16.01 119 1.015 108 1.364 108 10.366 81.6 182.1 7 102.9 2009 205 162200 162300 78.00 16.01 119 1.243 93 1.462 93 10.406 81.6 182.1 7 102.9 2009 205 162300 162400 78.00 16.01 119 1.674 119 1.543 119 10.567 81.6 182.1 7 103.0 2009 205 162400 162500 78.00 16.01 119 1.847 108 2.538 108 10.618 81.6 182.1 7 103.0 2009 205 162500 162600 78.00 16.01 108 1.566 108 2.518 108 10.810 81.6 182.1 7 103.0 2009 205 162600 162700 78.00 16.01 141 0.969 104 1.002 104 10.432 81.6 182.1 7 103.1 2009 205 162700 162800 78.00 16.01 125 0.640 113 0.627 113 10.042 81.6 182.1 7 103.1 2009 205 162800 162900 78.00 16.01 119 0.702 114 0.869 114 10.362 81.6 182.1 7 103.2 2009 205 162900 163000 78.00 16.01 125 0.720 108 0.677 141 10.206 81.6 182.1 7 103.2 2009 205 163000 163100 78.00 16.01 133 0.967 113 0.516 141 10.404 81.6 182.1 7 103.3 2009 205 163100 163200 78.00 16.01 125 1.196 108 0.949 133 10.412 81.6 182.1 7 103.3 2009 205 163200 163300 78.00 16.01 133 0.906 113 0.661 133 10.338 81.6 182.1 7 103.4 2009 205 163300 163400 78.00 16.01 133 0.899 114 0.769 141 10.333 81.6 182.1 7 103.4 2009 205 163400 163500 78.00 16.01 133 1.044 113 0.829 133 10.373 81.6 182.1 7 103.5 2009 205 163500 163600 78.00 16.01 133 1.026 113 1.241 133 10.308 81.6 182.1 7 103.5 2009 205 163600 163700 78.00 16.01 133 1.147 104 0.801 133 10.484 81.6 182.1 7 103.6 2009 205 163700 163800 78.00 16.01 125 1.428 104 1.332 125 10.537 81.6 182.1 7 103.6 2009 205 163800 163900 78.00 16.01 119 1.337 104 1.939 104 10.725 81.6 182.1 7 103.7 2009 205 163900 164000 78.00 16.01 119 1.428 114 1.306 119 10.357 81.6 182.1 7 103.7 2009 205 164000 164100 78.00 16.01 119 1.420 113 1.379 113 10.354 81.6 182.1 7 103.8 2009 205 164100 164200 78.00 16.01 114 1.530 114 1.674 114 10.470 81.6 182.1 7 103.8 2009 205 164200 164300 78.00 16.01 114 1.207 114 1.359 114 10.516 81.6 182.1 7 103.9 2009 205 164300 164400 78.00 16.01 114 0.755 104 0.711 141 10.132 81.6 182.1 7 103.9 2009 205 164400 164500 78.00 16.01 114 0.955 108 1.510 108 10.445 81.6 182.1 7 104.0 2009 205 164500 164600 78.00 16.01 133 0.830 108 0.928 141 10.213 81.6 182.1 7 104.0 2009 205 164600 164700 78.00 16.01 132 0.617 104 0.770 104 10.311 81.6 182.1 7 104.1 2009 205 164700 164800 78.00 16.01 132 0.681 113 0.565 141 10.165 81.6 182.1 7 104.2 2009 205 164800 164900 78.00 16.01 119 0.711 104 0.791 141 10.184 81.6 182.1 7 104.2 2009 205 164900 165000 78.00 16.01 125 0.675 104 0.758 104 10.182 81.6 182.1 7 104.3 2009 205 165000 165100 78.00 16.01 119 0.985 104 1.474 104 10.748 81.6 182.1 7 104.3 2009 205 165100 165200 78.00 16.01 104 0.899 104 2.802 104 11.020 81.6 182.1 7 104.4 2009 205 165200 165300 78.00 16.01 104 0.848 104 2.696 104 11.028 81.6 182.1 7 104.4 2009 205 165300 165400 78.00 16.01 104 0.861 104 3.079 104 10.998 81.6 182.1 7 104.5 2009 205 165400 165500 78.00 16.01 104 0.871 104 2.104 104 11.010 81.6 182.1 7 104.5 2009 205 165500 165600 78.00 16.01 104 1.470 104 3.922 104 11.111 81.6 182.1 7 104.6 2009 205 165600 165700 78.00 16.01 104 1.856 104 5.357 104 11.214 81.6 182.1 7 104.6 2009 205 165700 165800 78.00 16.01 104 1.953 104 5.283 104 11.267 81.6 182.1 7 104.7 2009 205 165800 165900 78.00 16.01 104 3.180 104 5.042 104 11.235 81.6 182.1 7 104.7 2009 205 165900 170000 78.00 16.01 104 1.836 104 5.407 104 11.282 81.6 182.1 7 104.8 2009 205 170000 170100 78.00 16.01 104 2.216 104 7.523 104 11.352 81.6 182.1 7 104.8 2009 205 170100 170200 78.00 16.01 108 2.850 104 6.691 104 11.270 81.6 182.1 7 104.9 2009 205 170200 170300 78.00 16.01 108 2.552 104 7.627 104 11.344 81.6 182.1 7 104.9 2009 205 170300 170400 78.00 16.01 108 1.218 104 6.825 104 11.293 81.6 182.1 7 105.0 2009 205 170400 170500 78.00 16.01 108 1.280 104 6.153 104 11.238 81.6 182.1 7 105.0 2009 205 170500 170600 78.00 16.01 108 0.848 108 4.766 108 11.050 81.6 182.1 7 105.1 2009 205 170600 170700 78.00 16.01 108 0.835 108 3.145 108 10.901 81.6 182.1 7 105.1 2009 205 170700 170800 78.00 16.01 108 1.137 108 2.347 108 10.809 81.6 182.1 7 105.2 2009 205 170800 170900 78.00 16.01 119 1.473 108 3.253 108 10.953 81.6 182.1 7 105.2 2009 205 170900 171000 78.00 16.01 125 0.511 89 0.372 141 10.168 81.6 182.1 7 105.3 2009 205 171000 171100 78.00 16.01 119 0.611 89 0.634 119 10.072 81.6 182.1 7 105.3 2009 205 171100 171200 78.00 16.01 119 0.547 100 1.216 100 10.305 81.6 182.1 7 105.4 2009 205 171200 171300 78.00 16.01 113 0.580 100 1.471 100 10.546 81.6 182.1 7 105.4 2009 205 171300 171400 78.00 16.01 114 0.656 100 1.642 100 10.818 81.6 182.1 7 105.5 2009 205 171400 171500 78.00 16.01 125 0.649 100 1.414 100 10.798 81.6 182.1 7 105.5 2009 205 171500 171600 78.00 16.01 113 0.495 93 0.607 141 9.929 81.6 182.1 7 105.6 2009 205 171600 171700 78.00 16.01 119 0.528 113 0.755 119 9.967 81.6 182.1 7 105.6 2009 205 171700 171800 78.00 16.01 119 0.834 97 2.626 97 10.775 81.6 182.1 7 105.7 2009 205 171800 171900 78.00 16.01 125 0.792 97 0.601 141 10.133 81.6 182.1 7 105.7 2009 205 171900 172000 78.00 16.01 113 0.383 113 0.571 141 9.977 81.6 182.1 7 105.8 2009 205 172000 172100 78.00 16.01 133 0.263 89 0.228 133 9.791 81.6 182.1 7 105.8 2009 205 172100 172200 78.00 16.01 119 0.475 113 0.556 119 9.952 81.6 182.1 7 105.9 2009 205 172200 172300 78.00 16.01 133 0.314 93 0.367 141 10.046 81.6 182.1 7 105.9 2009 205 172300 172330 78.00 16.01 141 0.786 108 1.230 141 10.551 81.6 182.1 7 106.0 2009 205 172742 172800 78.00 16.01 119 1.269 86 1.233 119 10.424 81.6 182.1 7 106.2 2009 205 172800 172900 78.00 16.01 126 0.579 93 0.579 126 10.044 81.6 182.1 7 106.2 2009 205 172900 173000 78.00 16.01 125 0.713 97 0.977 125 10.255 81.6 182.1 7 106.3 2009 205 173000 173100 78.00 16.01 125 0.343 93 0.472 93 10.053 81.6 182.1 7 106.3 2009 205 173100 173200 78.00 16.01 133 0.410 108 0.352 141 10.055 81.6 182.1 7 106.4 2009 205 173200 173300 78.00 16.01 119 0.527 114 0.593 133 9.991 81.6 182.1 7 106.4 2009 205 173300 173400 78.00 16.01 125 0.368 93 0.403 125 9.924 81.6 182.1 7 106.5 2009 205 173400 173500 78.00 16.01 133 0.479 108 0.668 133 10.299 81.6 182.1 7 106.5 2009 205 173500 173600 78.00 16.01 119 0.195 93 0.362 93 9.777 81.6 182.1 7 106.6 2009 205 173600 173700 78.00 16.01 119 0.364 119 0.579 119 10.068 81.6 182.1 7 106.6 2009 205 173700 173800 78.00 16.01 125 0.504 97 0.598 133 10.122 81.6 182.1 7 106.7 2009 205 173800 173900 78.00 16.01 133 0.396 89 0.339 133 10.289 81.6 182.1 7 106.8 2009 205 173900 174000 78.00 16.01 113 0.368 113 0.394 113 9.945 81.6 182.1 7 106.8 2009 205 174000 174100 78.00 16.01 125 0.507 89 0.287 141 9.970 81.6 182.1 7 106.9 2009 205 174100 174200 78.00 16.01 119 0.316 89 0.286 119 9.756 81.6 182.1 7 106.9 2009 205 174200 174300 78.00 16.01 119 0.499 119 0.495 119 10.063 81.6 182.1 7 107.0 2009 205 174300 174400 78.00 16.01 125 0.482 93 0.443 141 10.114 81.6 182.1 7 107.0 2009 205 174400 174500 78.00 16.01 119 0.297 93 0.419 93 9.881 81.6 182.1 7 107.1 2009 205 174500 174600 78.00 16.01 119 0.354 93 0.548 93 10.005 81.6 182.1 7 107.1 2009 205 174600 174700 78.00 16.01 133 0.327 108 0.467 133 9.942 81.6 182.1 7 107.2 2009 205 174700 174800 78.00 16.01 125 0.336 89 0.354 125 9.948 81.6 182.1 7 107.2 2009 205 174800 174900 78.00 16.01 125 0.434 89 0.317 141 9.999 81.6 182.1 7 107.3 2009 205 174900 175000 78.00 16.01 125 0.347 108 0.608 108 9.853 81.6 182.1 7 107.3 2009 205 175000 175100 78.00 16.01 125 0.342 93 0.362 93 9.822 81.6 182.1 7 107.4 2009 205 175100 175200 78.00 16.01 133 0.570 108 0.594 133 10.460 81.6 182.1 7 107.4 2009 205 175200 175300 78.00 16.01 141 0.537 93 0.434 141 10.332 81.6 182.1 7 107.5 2009 205 175300 175400 78.00 16.01 119 0.408 89 0.417 141 9.912 81.6 182.1 7 107.5 2009 205 175400 175500 78.00 16.01 133 0.321 93 0.343 141 9.841 81.6 182.1 7 107.6 2009 205 175500 175600 78.00 16.01 119 0.496 119 0.436 119 10.237 81.6 182.1 7 107.6 2009 205 175600 175700 78.00 16.01 119 0.387 89 0.306 141 9.691 81.6 182.1 7 107.7 2009 205 175700 175800 78.00 16.01 119 0.526 119 0.512 119 9.973 81.6 182.1 7 107.7 2009 205 175800 175900 78.00 16.01 125 0.424 100 1.080 100 10.757 81.6 182.1 7 107.8 2009 205 175900 180000 78.00 16.01 108 0.553 108 1.227 108 10.657 81.6 182.1 7 107.8 2009 205 180000 180100 78.00 16.01 113 0.594 100 1.331 100 10.448 81.6 182.1 3 107.9 2009 205 180100 180200 78.00 16.01 113 0.359 100 0.637 100 10.482 81.6 182.1 3 107.9 2009 205 180200 180300 78.00 16.01 119 0.525 100 1.390 100 10.672 81.6 182.1 3 108.0 2009 205 180300 180400 78.00 16.01 119 0.815 100 1.560 100 10.838 81.6 182.1 3 108.0 2009 205 180400 180500 78.00 16.01 100 0.481 100 1.718 100 11.131 81.6 182.1 3 108.1 2009 205 180500 180600 78.00 16.01 108 0.596 100 2.102 100 10.755 81.6 182.1 3 108.1 2009 205 180600 180700 78.00 16.01 100 0.385 100 1.142 100 10.707 81.6 182.1 3 108.2 2009 205 180700 180800 78.00 16.01 119 0.599 100 1.289 100 10.644 81.6 182.1 3 108.2 2009 205 180800 180900 78.00 16.01 100 0.335 100 1.302 100 10.790 81.6 182.1 3 108.3 2009 205 180900 181000 78.00 16.01 104 0.506 100 1.682 100 10.716 81.6 182.1 3 108.3 2009 205 181000 181100 78.00 16.01 113 0.515 100 1.542 100 10.560 81.6 182.1 3 108.4 2009 205 181100 181200 78.00 16.01 133 0.745 100 1.035 133 10.351 81.6 182.1 3 108.4 2009 205 181200 181300 78.00 16.01 125 0.649 100 1.164 100 10.258 81.6 182.1 3 108.5 2009 205 181300 181400 78.00 16.01 133 0.610 100 1.008 100 10.303 81.6 182.1 3 108.5 2009 205 181400 181500 78.00 16.01 141 0.303 100 0.492 100 10.261 81.6 182.1 3 108.6 2009 205 181500 181600 78.00 16.01 119 0.529 100 0.868 100 10.696 81.6 182.1 3 108.6 2009 205 181600 181700 78.00 16.01 125 0.527 100 0.596 100 10.475 81.6 182.1 3 108.7 2009 205 181700 181800 78.00 16.01 125 0.312 89 0.328 133 9.824 81.6 182.1 3 108.7 2009 205 181800 181900 78.00 16.01 119 0.319 100 0.440 141 9.864 81.6 182.1 3 108.8 2009 205 181900 182000 78.00 16.01 119 0.387 113 0.519 113 9.827 81.6 182.1 3 108.8 2009 205 182000 182100 78.00 16.01 141 0.195 108 0.224 141 9.872 81.6 182.1 3 108.9 2009 205 182100 182200 78.00 16.01 133 0.402 89 0.198 133 10.010 81.6 182.1 3 108.9 2009 205 182200 182300 78.00 16.01 113 0.608 113 0.654 113 10.332 81.6 182.1 3 109.0 2009 205 182300 182400 78.00 16.01 125 0.398 108 0.412 141 10.043 81.6 182.1 3 109.0 2009 205 182400 182500 78.00 16.01 133 0.057 89 0.036 133 9.097 81.6 182.1 3 109.1 2009 205 182500 182600 78.00 16.01 119 0.409 108 0.582 119 10.000 81.6 182.1 3 109.1 2009 205 182600 182700 78.00 16.01 114 0.570 114 0.543 141 10.230 81.6 182.1 3 109.2 2009 205 182700 182800 78.00 16.01 125 0.507 89 0.384 141 10.094 81.6 182.1 3 109.2 2009 205 182800 182900 78.00 16.01 133 0.486 93 0.668 133 10.031 81.6 182.1 3 109.3 2009 205 182900 183000 78.00 16.01 125 0.459 108 0.377 141 10.089 81.6 182.1 3 109.3 2009 205 183000 183100 78.00 16.01 125 0.507 108 0.599 125 10.011 81.6 182.1 3 109.4 2009 205 183100 183200 78.00 16.01 125 0.770 108 1.121 113 10.251 81.6 182.1 3 109.4 2009 205 183200 183300 78.00 16.01 119 0.647 114 0.822 141 10.202 81.6 182.1 3 109.5 2009 205 183300 183400 78.00 16.01 125 0.686 108 0.580 125 10.081 81.6 182.1 3 109.5 2009 205 183400 183500 78.00 16.01 119 0.568 108 0.627 141 10.030 81.6 182.1 3 109.6 2009 205 183500 183600 78.00 16.01 125 0.574 89 0.383 141 10.295 81.6 182.1 3 109.6 2009 205 183600 183700 78.00 16.01 119 0.538 113 0.489 141 10.063 81.6 182.1 3 109.7 2009 205 183700 183800 78.00 16.01 125 0.510 108 0.658 108 10.051 81.6 182.1 3 109.7 2009 205 183800 183900 78.00 16.01 119 0.407 89 0.482 119 9.986 81.6 182.1 3 109.8 2009 205 183900 184000 78.00 16.01 125 0.401 108 0.556 108 10.024 81.6 182.1 3 109.8 2009 205 184000 184100 78.00 16.01 126 0.469 100 0.896 100 10.251 81.6 182.1 3 109.8 2009 205 184100 184200 78.00 16.01 125 0.794 108 0.723 133 10.324 81.6 182.1 3 109.9 2009 205 184200 184300 78.00 16.01 125 0.373 104 0.870 104 10.391 81.6 182.1 3 109.9 2009 205 184300 184400 78.00 16.01 125 0.275 108 0.310 141 9.962 81.6 182.1 3 110.0 2009 205 184400 184500 78.00 16.01 119 0.503 108 0.724 108 10.175 81.6 182.1 3 110.0 2009 205 184500 184600 78.00 16.01 119 0.561 113 0.506 141 10.158 81.6 182.1 3 110.1 2009 205 184600 184700 78.00 16.01 133 0.543 108 0.528 133 10.223 81.6 182.1 3 110.1 2009 205 184700 184800 78.00 16.01 133 0.411 86 0.337 133 9.991 81.6 182.1 3 110.2 2009 205 184800 184900 78.00 16.01 113 0.558 113 0.802 113 10.193 81.6 182.1 3 110.2 2009 205 184900 185000 78.00 16.01 119 0.505 93 0.537 119 9.879 81.6 182.1 3 110.3 2009 205 185000 185100 78.00 16.01 119 0.732 93 0.804 93 10.309 81.6 182.1 3 110.3 2009 205 185100 185200 78.00 16.01 119 0.783 93 1.152 93 10.397 81.6 182.1 3 110.4 2009 205 185200 185300 78.00 16.01 141 0.462 93 0.891 93 10.422 81.6 182.1 3 110.4 2009 205 185300 185400 78.00 16.01 141 0.339 89 0.192 141 10.339 81.6 182.1 3 110.5 2009 205 185400 185500 78.00 16.01 125 0.676 93 1.571 93 10.542 81.6 182.1 3 110.5 2009 205 185500 185600 78.00 16.01 133 0.670 93 1.391 93 10.469 81.6 182.1 3 110.6 2009 205 185600 185700 78.00 16.01 113 0.394 93 1.095 93 10.340 81.6 182.1 3 110.6 2009 205 185700 185800 78.00 16.01 125 0.623 93 1.147 93 10.346 81.6 182.1 3 110.7 2009 205 185800 185900 78.00 16.01 119 0.289 93 0.755 93 10.274 81.6 182.1 3 110.7 2009 205 185900 190000 78.00 16.01 113 0.695 108 1.382 108 10.413 81.6 182.1 3 110.8 2009 205 190000 190100 78.00 16.01 125 0.682 93 0.989 125 10.315 81.6 182.1 3 110.8 2009 205 190100 190200 78.00 16.01 113 0.525 93 0.946 113 10.168 81.6 182.1 3 110.8 2009 205 190200 190300 78.00 16.01 125 0.670 104 1.197 104 10.159 81.6 182.1 3 110.9 2009 205 190300 190400 78.00 16.01 108 0.352 108 0.773 108 10.395 81.6 182.1 3 110.9 2009 205 190400 190500 78.00 16.01 125 0.575 104 1.009 104 10.255 81.6 182.1 3 111.0 2009 205 190500 190600 78.00 16.01 125 0.898 108 0.912 125 10.277 81.6 182.1 3 111.0 2009 205 190600 190700 78.00 16.01 125 0.810 108 1.302 108 10.448 81.6 182.1 3 111.1 2009 205 190700 190800 78.00 16.01 119 0.727 119 0.859 119 10.415 81.6 182.1 3 111.1 2009 205 190800 190900 78.00 16.01 119 0.842 86 0.735 133 10.175 81.6 182.1 3 111.2 2009 205 190900 191000 78.00 16.01 113 0.608 108 1.057 113 10.204 81.6 182.1 3 111.2 2009 205 191000 191100 78.00 16.01 113 0.826 113 1.111 141 10.304 81.6 182.1 3 111.3 2009 205 191100 191200 78.00 16.01 119 0.884 113 0.878 141 10.234 81.6 182.1 3 111.3 2009 205 191200 191300 78.00 16.01 132 0.336 86 0.403 141 9.726 81.6 182.1 3 111.4 2009 205 191300 191400 78.00 16.01 108 0.505 108 0.792 108 10.320 81.6 182.1 3 111.4 2009 205 191400 191500 78.00 16.01 119 1.066 93 1.307 119 10.434 81.6 182.1 3 111.4 2009 205 191500 191600 78.00 16.01 119 0.904 113 0.854 141 10.172 81.6 182.1 3 111.5 2009 205 191600 191700 78.00 16.01 119 0.365 93 0.708 93 10.307 81.6 182.1 3 111.5 2009 205 191700 191800 78.00 16.01 125 0.556 93 1.191 93 10.235 81.6 182.1 3 111.6 2009 205 191800 191900 78.00 16.01 126 0.908 93 0.971 126 10.390 81.6 182.1 3 111.6 2009 205 191900 192000 78.00 16.01 113 0.966 113 1.292 113 10.307 81.6 182.1 3 111.7 2009 205 192000 192100 78.00 16.01 125 0.886 93 0.882 141 10.465 81.6 182.1 3 111.7 2009 205 192100 192200 78.00 16.01 119 0.620 89 0.591 119 9.909 81.6 182.1 3 111.8 2009 205 192200 192300 78.00 16.01 119 1.927 104 3.525 104 10.825 81.6 182.1 3 111.8 2009 205 192300 192400 78.00 16.01 125 0.635 89 0.510 133 9.945 81.6 182.1 3 111.8 2009 205 192400 192500 78.00 16.01 119 0.692 93 0.793 133 10.148 81.6 182.1 3 111.9 2009 205 192500 192600 78.00 16.01 119 0.659 89 0.686 119 10.062 81.6 182.1 3 111.9 2009 205 192600 192700 78.00 16.01 119 0.527 89 0.591 141 10.234 81.6 182.1 3 112.0 2009 205 192700 192800 78.00 16.01 125 0.748 113 0.697 141 10.157 81.6 182.1 3 112.0 2009 205 192800 192900 78.00 16.01 125 0.507 89 0.543 125 9.958 81.6 182.1 3 112.1 2009 205 192900 193000 78.00 16.01 113 0.656 113 0.729 113 10.232 81.6 182.1 3 112.1 2009 205 193000 193100 78.00 16.01 114 0.736 114 0.610 141 10.202 81.6 182.1 3 112.2 2009 205 193100 193200 78.00 16.01 133 0.337 108 0.530 108 10.026 81.6 182.1 3 112.2 2009 205 193200 193300 78.00 16.01 133 0.785 89 0.629 133 10.553 81.6 182.1 3 112.2 2009 205 193300 193400 78.00 16.01 125 0.819 93 1.074 93 10.297 81.6 182.1 3 112.3 2009 205 193400 193500 78.00 16.01 119 0.598 119 0.734 119 10.176 81.6 182.1 3 112.3 2009 205 193500 193600 78.00 16.01 125 0.770 108 0.912 125 10.274 81.6 182.1 3 112.4 2009 205 193600 193700 78.00 16.01 125 0.670 108 1.035 108 10.359 81.6 182.1 3 112.4 2009 205 193700 193800 78.00 16.01 119 0.640 89 1.085 113 10.009 81.6 182.1 3 112.5 2009 205 193800 193900 78.00 16.01 125 0.626 114 0.859 114 9.997 81.6 182.1 3 112.5 2009 205 193900 194000 78.00 16.01 119 0.553 93 1.605 93 10.597 81.6 182.1 3 112.5 2009 205 194000 194100 78.00 16.01 119 0.479 89 0.764 108 9.885 81.6 182.1 3 112.6 2009 205 194100 194200 78.00 16.01 125 0.866 89 0.706 125 10.313 81.6 182.1 3 112.6 2009 205 194200 194300 78.00 16.01 133 0.379 89 0.514 133 9.913 81.6 182.1 3 112.7 2009 205 194300 194400 78.00 16.01 119 0.567 108 0.757 141 10.088 81.6 182.1 3 112.7 2009 205 194400 194500 78.00 16.01 119 0.871 119 0.976 119 10.329 81.6 182.1 3 112.8 2009 205 194500 194600 78.00 16.01 125 0.354 89 0.473 113 9.529 81.6 182.1 3 112.8 2009 205 194600 194700 78.00 16.01 119 0.465 89 0.735 108 9.968 81.6 182.1 3 112.8 2009 205 194700 194800 78.00 16.01 119 0.428 89 0.485 141 10.122 81.6 182.1 3 112.9 2009 205 194800 194900 78.00 16.01 125 0.596 89 0.597 125 10.128 81.6 182.1 3 112.9 2009 205 194900 195000 78.00 16.01 125 0.395 89 0.422 141 9.966 81.6 182.1 3 113.0 2009 205 195000 195100 78.00 16.01 86 0.277 89 0.378 142 9.533 81.6 182.1 3 113.0 2009 205 195100 195200 78.00 16.01 125 0.540 89 0.484 133 9.947 81.6 182.1 3 113.0 2009 205 195200 195300 78.00 16.01 119 0.919 119 0.705 119 10.427 81.6 182.1 3 113.1 2009 205 195300 195400 78.00 16.01 119 0.410 89 0.498 119 9.841 81.6 182.1 3 113.1 2009 205 195400 195500 78.00 16.01 125 0.376 89 0.464 93 9.818 81.6 182.1 3 113.2 2009 205 195500 195600 78.00 16.01 119 0.799 113 0.795 113 10.278 81.6 182.1 3 113.2 2009 205 195600 195700 78.00 16.01 119 0.877 108 1.309 108 10.651 81.6 182.1 3 113.2 2009 205 195700 195800 78.00 16.01 119 0.610 89 0.600 125 9.887 81.6 182.1 3 113.3 2009 205 195800 195900 78.00 16.01 125 0.459 93 0.724 93 10.285 81.6 182.1 3 113.3 2009 205 195900 200000 78.00 16.01 125 0.470 89 0.463 93 9.797 81.6 182.1 3 113.4 2009 205 200000 200100 78.00 16.01 125 0.984 86 0.634 125 10.327 81.6 182.1 3 113.4 2009 205 200100 200200 78.00 16.01 125 0.445 89 0.422 141 9.863 81.6 182.1 3 113.4 2009 205 200200 200300 78.00 16.01 133 0.539 89 0.457 141 10.217 81.6 182.1 3 113.5 2009 205 200300 200400 78.00 16.01 142 0.709 89 0.476 142 10.392 81.6 182.1 3 113.5 2009 205 200400 200500 78.00 16.01 119 0.574 93 0.735 141 10.164 81.6 182.1 3 113.6 2009 205 200500 200600 78.00 16.01 141 0.470 89 0.384 141 10.240 81.6 182.1 3 113.6 2009 205 200600 200700 78.00 16.01 113 0.697 113 0.846 113 10.429 81.6 182.1 3 113.6 2009 205 200700 200800 78.00 16.01 125 0.555 86 0.471 125 9.899 81.6 182.1 3 113.7 2009 205 200800 200900 78.00 16.01 119 0.272 119 0.280 119 9.777 81.6 182.1 3 113.7 2009 205 200900 201000 78.00 16.01 125 0.887 108 0.842 125 10.382 81.6 182.1 3 113.8 2009 205 201000 201100 78.00 16.01 125 0.978 114 0.818 141 10.258 81.6 182.1 3 113.8 2009 205 201100 201200 78.00 16.01 125 1.143 86 0.639 132 10.557 81.6 182.1 3 113.8 2009 205 201200 201300 78.00 16.01 125 0.460 113 0.539 113 10.077 81.6 182.1 3 113.9 2009 205 201300 201400 78.00 16.01 119 0.480 86 0.443 119 9.610 81.6 182.1 3 113.9 2009 205 201400 201500 78.00 16.01 125 0.643 89 0.815 125 10.088 81.6 182.1 3 113.9 2009 205 201500 201600 78.00 16.01 125 0.615 86 0.541 125 10.036 81.6 182.1 3 114.0 2009 205 201600 201700 78.00 16.01 125 0.747 86 0.606 141 10.262 81.6 182.1 3 114.0 2009 205 201700 201800 78.00 16.01 141 0.734 114 0.617 141 10.484 81.6 182.1 3 114.0 2009 205 201800 201900 78.00 16.01 125 0.660 86 0.548 133 9.962 81.6 182.1 3 114.1 2009 205 201900 202000 78.00 16.01 125 0.465 86 0.409 125 9.764 81.6 182.1 3 114.1 2009 205 202000 202100 78.00 16.01 125 0.719 108 0.785 108 10.182 81.6 182.1 3 114.2 2009 205 202100 202200 78.00 16.01 119 0.472 86 0.439 141 10.001 81.6 182.1 3 114.2 2009 205 202200 202300 78.00 16.01 119 0.648 119 0.874 119 10.236 81.6 182.1 3 114.2 2009 205 202300 202400 78.00 16.01 113 0.325 86 0.412 113 9.782 81.6 182.1 3 114.3 2009 205 202400 202500 78.00 16.01 133 0.650 114 0.772 133 10.212 81.6 182.1 3 114.3 2009 205 202500 202600 78.00 16.01 125 0.481 89 0.333 133 9.906 81.6 182.1 3 114.3 2009 205 202600 202700 78.00 16.01 119 0.710 86 0.466 141 10.187 81.6 182.1 3 114.4 2009 205 202700 202800 78.00 16.01 141 0.508 114 0.339 141 10.217 81.6 182.1 3 114.4 2009 205 202800 202900 78.00 16.01 119 0.343 89 0.307 132 9.603 81.6 182.1 3 114.4 2009 205 202900 203000 78.00 16.01 119 0.693 119 0.478 119 10.050 81.6 182.1 3 114.5 2009 205 203000 203100 78.00 16.01 125 0.566 89 0.337 125 9.952 81.6 182.1 3 114.5 2009 205 203100 203200 78.00 16.01 119 0.679 119 0.617 119 10.175 81.6 182.1 3 114.5 2009 205 203200 203300 78.00 16.01 133 0.489 89 0.311 141 10.221 81.6 182.1 3 114.6 2009 205 203300 203400 78.00 16.01 119 0.525 108 0.614 141 10.026 81.6 182.1 3 114.6 2009 205 203400 203500 78.00 16.01 119 0.525 108 0.583 108 9.992 81.6 182.1 3 114.7 2009 205 203500 203600 78.00 16.01 119 0.645 113 0.355 133 10.172 81.6 182.1 3 114.7 2009 205 203600 203700 78.00 16.01 125 0.479 108 0.435 108 10.029 81.6 182.1 3 114.7 2009 205 203700 203800 78.00 16.01 119 0.556 108 0.640 119 10.002 81.6 182.1 3 114.8 2009 205 203800 203900 78.00 16.01 125 0.480 113 0.395 113 9.885 81.6 182.1 3 114.8 2009 205 203900 204000 78.00 16.01 119 0.647 119 0.480 119 10.183 81.6 182.1 3 114.8 2009 205 204000 204100 78.00 16.01 119 0.513 113 0.392 133 9.912 81.6 182.1 3 114.9 2009 205 204100 204200 78.00 16.01 119 0.630 119 0.413 125 10.012 81.6 182.1 3 114.9 2009 205 204200 204300 78.00 16.01 119 0.629 114 0.543 119 10.080 81.6 182.1 3 114.9 2009 205 204300 204400 78.00 16.01 113 0.547 113 0.443 113 10.026 81.6 182.1 3 115.0 2009 205 204400 204500 78.00 16.01 125 0.486 86 0.296 141 9.782 81.6 182.1 3 115.0 2009 205 204500 204600 78.00 16.01 125 0.748 113 0.416 125 10.192 81.6 182.1 3 115.0 2009 205 204600 204700 78.00 16.01 125 0.543 114 0.431 114 9.942 81.6 182.1 3 115.0 2009 205 204700 204800 78.00 16.01 119 0.273 108 0.318 141 9.987 81.6 182.1 3 115.1 2009 205 204800 204900 78.00 16.01 113 0.512 113 0.666 113 10.046 81.6 182.1 3 115.1 2009 205 204900 205000 78.00 16.01 133 0.516 108 0.617 133 10.117 81.6 182.1 3 115.1 2009 205 205000 205100 78.00 16.01 113 0.448 113 0.599 113 10.145 81.6 182.1 3 115.2 2009 205 205100 205200 78.00 16.01 113 0.437 113 0.425 113 9.950 81.6 182.1 3 115.2 2009 205 205200 205300 78.00 16.01 119 0.537 108 0.648 141 10.077 81.6 182.1 3 115.2 2009 205 205300 205400 78.00 16.01 125 0.633 108 0.650 141 10.224 81.6 182.1 3 115.3 2009 205 205400 205500 78.00 16.01 125 0.589 108 0.537 133 10.015 81.6 182.1 3 115.3 2009 205 205500 205600 78.00 16.01 119 0.341 108 0.383 108 9.746 81.6 182.1 3 115.3 2009 205 205600 205700 78.00 16.01 119 0.360 108 0.439 108 10.042 81.6 182.1 3 115.4 2009 205 205700 205800 78.00 16.01 132 0.594 119 0.303 132 10.147 81.6 182.1 3 115.4 2009 205 205800 205900 78.00 16.01 133 0.533 86 0.258 141 10.130 81.6 182.1 3 115.4 2009 205 205900 210000 78.00 16.01 119 0.572 89 0.387 133 9.999 81.6 182.1 3 115.4 2009 205 210000 210100 78.00 16.01 113 0.347 108 0.579 108 10.266 81.6 182.1 17 115.5 2009 205 210100 210200 78.00 16.01 133 0.455 113 0.485 133 10.095 81.6 182.1 17 115.5 2009 205 210200 210300 78.00 16.01 113 0.245 86 0.223 141 9.645 81.6 182.1 17 115.5 2009 205 210300 210400 78.00 16.01 119 0.393 113 0.512 119 9.874 81.6 182.1 17 115.6 2009 205 210400 210500 78.00 16.01 125 0.343 104 0.523 104 10.114 81.6 182.1 17 115.6 2009 205 210500 210600 78.00 16.01 119 0.157 104 0.274 104 9.838 81.6 182.1 17 115.6 2009 205 210600 210700 78.00 16.01 119 0.312 86 0.197 133 9.809 81.6 182.1 17 115.6 2009 205 210700 210800 78.00 16.01 133 0.294 108 0.304 108 9.900 81.6 182.1 17 115.7 2009 205 210800 210900 78.00 16.01 113 0.354 108 0.523 113 9.935 81.6 182.1 17 115.7 2009 205 210900 211000 78.00 16.01 125 0.424 108 0.513 125 10.040 81.6 182.1 17 115.7 2009 205 211000 211100 78.00 16.01 113 0.201 89 0.294 141 9.631 81.6 182.1 17 115.8 2009 205 211100 211200 78.00 16.01 119 0.360 108 0.562 108 9.910 81.6 182.1 17 115.8 2009 205 211200 211300 78.00 16.01 125 0.312 104 0.450 104 10.149 81.6 182.1 17 115.8 2009 205 211300 211400 78.00 16.01 119 0.214 108 0.497 108 10.018 81.6 182.1 17 115.8 2009 205 211400 211500 78.00 16.01 119 0.302 108 0.199 142 10.089 81.6 182.1 17 115.9 2009 205 211500 211600 78.00 16.01 119 0.255 113 0.251 142 9.859 81.6 182.1 17 115.9 2009 205 211600 211700 78.00 16.01 132 0.310 89 0.329 132 9.833 81.6 182.1 17 115.9 2009 205 211700 211800 78.00 16.01 133 0.240 108 0.400 133 9.906 81.6 182.1 17 115.9 2009 205 211800 211900 78.00 16.01 119 0.283 108 0.514 108 9.756 81.6 182.1 17 116.0 2009 205 211900 212000 78.00 16.01 125 0.351 114 0.324 125 9.841 81.6 182.1 17 116.0 2009 205 212000 212100 78.00 16.01 125 0.286 89 0.200 133 9.701 81.6 182.1 17 116.0 2009 205 212100 212200 78.00 16.01 119 0.275 104 0.466 141 9.943 81.6 182.1 17 116.0 2009 205 212200 212300 78.00 16.01 113 0.271 113 0.451 113 9.791 81.6 182.1 17 116.1 2009 205 212300 212400 78.00 16.01 119 0.275 108 0.390 114 9.694 81.6 182.1 17 116.1 2009 205 212400 212500 78.00 16.01 119 0.206 108 0.363 108 9.780 81.6 182.1 17 116.1 2009 205 212500 212600 78.00 16.01 125 0.303 108 0.479 113 9.752 81.6 182.1 17 116.1 2009 205 212600 212700 78.00 16.01 119 0.296 119 0.255 141 9.753 81.6 182.1 17 116.2 2009 205 212700 212800 78.00 16.01 119 0.194 108 0.328 108 9.895 81.6 182.1 17 116.2 2009 205 212800 212900 78.00 16.01 125 0.232 108 0.350 141 9.942 81.6 182.1 17 116.2 2009 205 212900 213000 78.00 16.01 119 0.300 104 0.420 104 10.105 81.6 182.1 17 116.2 2009 205 213000 213100 78.00 16.01 119 0.194 89 0.156 141 9.475 81.6 182.1 17 116.3 2009 205 213100 213200 78.00 16.01 114 0.286 104 0.449 104 9.956 81.6 182.1 17 116.3 2009 205 213200 213300 78.00 16.01 133 0.305 89 0.217 133 9.891 81.6 182.1 17 116.3 2009 205 213300 213400 78.00 16.01 125 0.284 113 0.297 125 9.727 81.6 182.1 17 116.3 2009 205 213400 213500 78.00 16.01 119 0.390 104 0.624 119 9.912 81.6 182.1 17 116.3 2009 205 213500 213600 78.00 16.01 113 0.228 108 0.274 141 9.639 81.6 182.1 17 116.4 2009 205 213600 213700 78.00 16.01 125 0.313 108 0.355 125 9.777 81.6 182.1 17 116.4 2009 205 213700 213800 78.00 16.01 114 0.288 114 0.447 114 9.917 81.6 182.1 17 116.4 2009 205 213800 213900 78.00 16.01 119 0.276 89 0.299 119 9.642 81.6 182.1 17 116.4 2009 205 213900 214000 78.00 16.01 125 0.219 93 0.320 93 9.851 81.6 182.1 17 116.5 2009 205 214000 214100 78.00 16.01 125 0.274 108 0.468 108 9.954 81.6 182.1 17 116.5 2009 205 214100 214200 78.00 16.01 113 0.221 113 0.226 113 9.788 81.6 182.1 17 116.5 2009 205 214200 214300 78.00 16.01 93 0.696 93 5.115 93 11.319 81.6 182.1 17 116.5 2009 205 214300 214400 78.00 16.01 119 0.361 119 0.463 119 9.838 81.6 182.1 17 116.5 2009 205 214400 214500 78.00 16.01 125 0.323 113 0.231 125 9.753 81.6 182.1 17 116.6 2009 205 214500 214600 78.00 16.01 125 0.306 104 0.536 104 9.960 81.6 182.1 17 116.6 2009 205 214600 214700 78.00 16.01 125 0.365 113 0.400 113 9.983 81.6 182.1 17 116.6 2009 205 214700 214800 78.00 16.01 125 0.245 93 0.315 125 9.836 81.6 182.1 17 116.6 2009 205 214800 214900 78.00 16.01 119 0.269 104 0.333 104 9.735 81.6 182.1 17 116.6 2009 205 214900 215000 78.00 16.01 125 0.287 108 0.307 108 9.896 81.6 182.1 17 116.7 2009 205 215000 215100 78.00 16.01 114 0.286 108 0.423 133 9.693 81.6 182.1 17 116.7 2009 205 215100 215200 78.00 16.01 119 0.311 108 0.338 141 9.835 81.6 182.1 17 116.7 2009 205 215200 215300 78.00 16.01 119 0.378 114 0.545 114 9.830 81.6 182.1 17 116.7 2009 205 215300 215400 78.00 16.01 119 0.419 108 0.372 133 10.049 81.6 182.1 17 116.7 2009 205 215400 215500 78.00 16.01 119 0.256 104 0.359 119 9.705 81.6 182.1 17 116.7 2009 205 215500 215600 78.00 16.01 125 0.330 104 0.337 133 9.803 81.6 182.1 17 116.8 2009 205 215600 215700 78.00 16.01 125 0.200 108 0.284 108 9.849 81.6 182.1 17 116.8 2009 205 215700 215800 78.00 16.01 119 0.326 108 0.544 108 9.886 81.6 182.1 17 116.8 2009 205 215800 215900 78.00 16.01 113 0.263 104 0.446 142 9.728 81.6 182.1 17 116.8 2009 205 215900 220000 78.00 16.01 119 0.255 104 0.290 133 9.740 81.6 182.1 17 116.8 2009 205 220000 220100 78.00 16.01 119 0.277 119 0.258 119 9.840 81.6 182.1 17 116.9 2009 205 220100 220200 78.00 16.01 119 0.280 104 0.428 119 9.808 81.6 182.1 17 116.9 2009 205 220200 220300 78.00 16.01 125 0.294 104 0.283 125 9.725 81.6 182.1 17 116.9 2009 205 220300 220400 78.00 16.01 119 0.421 113 0.587 119 9.963 81.6 182.1 17 116.9 2009 205 220400 220500 78.00 16.01 100 3.520 100 15.159 100 11.872 81.6 182.1 17 116.9 2009 205 220500 220600 78.00 16.01 119 0.363 108 0.489 108 9.836 81.6 182.1 17 116.9 2009 205 220600 220700 78.00 16.01 119 0.419 119 0.523 119 9.910 81.6 182.1 17 116.9 2009 205 220700 220800 78.00 16.01 119 0.299 114 0.574 114 9.905 81.6 182.1 17 117.0 2009 205 220800 220900 78.00 16.01 119 0.376 93 0.565 119 9.942 81.6 182.1 17 117.0 2009 205 220900 221000 78.00 16.01 119 0.353 113 0.495 119 9.895 81.6 182.1 17 117.0 2009 205 221000 221100 78.00 16.01 119 0.355 113 0.404 125 9.837 81.6 182.1 17 117.0 2009 205 221100 221200 78.00 16.01 119 0.409 113 0.589 119 9.914 81.6 182.1 17 117.0 2009 205 221200 221300 78.00 16.01 119 0.213 104 0.514 104 9.919 81.6 182.1 17 117.0 2009 205 221300 221400 78.00 16.01 113 0.193 113 0.299 113 9.803 81.6 182.1 17 117.0 2009 205 221400 221500 78.00 16.01 125 0.316 104 0.461 141 9.745 81.6 182.1 17 117.1 2009 205 221500 221600 78.00 16.01 119 0.378 104 0.636 104 9.866 81.6 182.1 17 117.1 2009 205 221600 221700 78.00 16.01 119 0.414 86 0.320 141 10.228 81.6 182.1 17 117.1 2009 205 221700 221800 78.00 16.01 119 0.335 113 0.559 113 9.892 81.6 182.1 17 117.1 2009 205 221800 221900 78.00 16.01 119 0.352 108 0.555 108 10.076 81.6 182.1 17 117.1 2009 205 221900 222000 78.00 16.01 119 0.365 104 0.466 119 9.921 81.6 182.1 17 117.1 2009 205 222000 222100 78.00 16.01 113 0.413 113 0.529 113 10.248 81.6 182.1 17 117.1 2009 205 222100 222200 78.00 16.01 119 0.386 108 0.504 108 9.851 81.6 182.1 17 117.1 2009 205 222200 222300 78.00 16.01 119 0.334 113 0.453 119 9.821 81.6 182.1 17 117.2 2009 205 222300 222400 78.00 16.01 119 0.352 113 0.510 119 9.949 81.6 182.1 17 117.2 2009 205 222400 222500 78.00 16.01 119 0.455 104 0.699 104 10.042 81.6 182.1 17 117.2 2009 205 222500 222600 78.00 16.01 119 0.397 113 0.478 141 9.911 81.6 182.1 17 117.2 2009 205 222600 222700 78.00 16.01 119 0.356 113 0.324 113 9.946 81.6 182.1 17 117.2 2009 205 222700 222800 78.00 16.01 125 0.363 113 0.441 113 9.798 81.6 182.1 17 117.2 2009 205 222800 222900 78.00 16.01 125 0.436 108 0.788 108 10.184 81.6 182.1 17 117.2 2009 205 222900 223000 78.00 16.01 119 0.419 108 0.577 108 9.965 81.6 182.1 17 117.2 2009 205 223000 223100 78.00 16.01 119 0.371 104 0.635 104 10.000 81.6 182.1 17 117.2 2009 205 223100 223200 78.00 16.01 119 0.451 113 0.720 113 9.970 81.6 182.1 17 117.2 2009 205 223200 223300 78.00 16.01 119 0.439 113 0.566 119 9.876 81.6 182.1 17 117.3 2009 205 223300 223400 78.00 16.01 125 0.410 108 0.783 108 10.012 81.6 182.1 17 117.3 2009 205 223400 223500 78.00 16.01 119 0.452 104 0.824 104 10.053 81.6 182.1 17 117.3 2009 205 223500 223600 78.00 16.01 119 0.370 113 0.528 113 9.919 81.6 182.1 17 117.3 2009 205 223600 223700 78.00 16.01 119 0.367 104 0.774 104 10.056 81.6 182.1 17 117.3 2009 205 223700 223800 78.00 16.01 119 0.396 114 0.556 114 9.970 81.6 182.1 17 117.3 2009 205 223800 223900 78.00 16.01 119 0.433 113 0.546 113 9.909 81.6 182.1 17 117.3 2009 205 223900 224000 78.00 16.01 119 0.324 113 0.578 119 9.899 81.6 182.1 17 117.3 2009 205 224000 224100 78.00 16.01 119 0.540 113 0.790 113 10.119 81.6 182.1 17 117.3 2009 205 224100 224200 78.00 16.01 113 0.488 113 0.750 113 10.198 81.6 182.1 17 117.3 2009 205 224200 224300 78.00 16.01 113 0.430 113 0.755 113 10.080 81.6 182.1 17 117.3 2009 205 224300 224400 78.00 16.01 114 0.308 104 0.487 104 10.075 81.6 182.1 17 117.3 2009 205 224400 224500 78.00 16.01 113 0.404 113 0.799 113 10.095 81.6 182.1 17 117.3 2009 205 224500 224600 78.00 16.01 113 0.493 108 0.871 108 10.046 81.6 182.1 17 117.4 2009 205 224600 224700 78.00 16.01 113 0.379 113 0.649 113 10.058 81.6 182.1 17 117.4 2009 205 224700 224800 78.00 16.01 119 0.411 113 0.544 113 9.943 81.6 182.1 17 117.4 2009 205 224800 224900 78.00 16.01 113 0.380 108 0.737 108 10.074 81.6 182.1 17 117.4 2009 205 224900 225000 78.00 16.01 125 0.450 113 0.524 125 10.016 81.6 182.1 17 117.4 2009 205 225000 225100 78.00 16.01 125 0.379 82 0.639 108 9.909 81.6 182.1 17 117.4 2009 205 225100 225200 78.00 16.01 113 0.329 108 0.666 108 10.265 81.6 182.1 17 117.4 2009 205 225200 225300 78.00 16.01 113 0.233 104 0.403 113 9.890 81.6 182.1 17 117.4 2009 205 225300 225400 78.00 16.01 113 0.419 108 0.775 113 9.959 81.6 182.1 17 117.4 2009 205 225400 225500 78.00 16.01 113 0.292 104 0.641 104 10.257 81.6 182.1 17 117.4 2009 205 225500 225600 78.00 16.01 119 0.370 108 0.690 108 10.038 81.6 182.1 17 117.4 2009 205 225600 225700 78.00 16.01 119 0.358 108 0.584 108 10.108 81.6 182.1 17 117.4 2009 205 225700 225800 78.00 16.01 119 0.270 108 0.544 108 10.073 81.6 182.1 17 117.4 2009 205 225800 225900 78.00 16.01 113 0.341 104 0.592 104 9.983 81.6 182.1 17 117.4 2009 205 225900 230000 78.00 16.01 113 0.332 108 0.497 108 9.979 81.6 182.1 17 117.4 2009 205 230000 230100 78.00 16.01 113 0.285 108 0.631 108 10.021 81.6 182.1 17 117.4 2009 205 230100 230200 78.00 16.01 113 0.306 93 0.548 93 10.000 81.6 182.1 17 117.4 2009 205 230200 230300 78.00 16.01 113 0.310 113 0.476 113 9.853 81.6 182.1 17 117.4 2009 205 230300 230400 78.00 16.01 114 0.378 108 0.676 108 10.031 81.6 182.1 17 117.4 2009 205 230400 230500 78.00 16.01 119 0.328 104 0.607 104 9.839 81.6 182.1 17 117.4 2009 205 230500 230600 78.00 16.01 119 0.307 104 0.548 104 9.999 81.6 182.1 17 117.4 2009 205 230600 230700 78.00 16.01 119 0.323 108 0.731 108 10.165 81.6 182.1 17 117.4 2009 205 230700 230800 78.00 16.01 119 0.327 113 0.570 113 9.882 81.6 182.1 17 117.4 2009 205 230800 230900 78.00 16.01 113 0.231 104 0.542 104 9.997 81.6 182.1 17 117.4 2009 205 230900 231000 78.00 16.01 113 0.283 113 0.330 113 9.772 81.6 182.1 17 117.4 2009 205 231000 231100 78.00 16.01 119 0.361 108 0.566 108 9.954 81.6 182.1 17 117.4 2009 205 231100 231200 78.00 16.01 125 0.255 113 0.401 113 9.800 81.6 182.1 17 117.4 2009 205 231200 231300 78.00 16.01 119 0.366 114 0.623 114 9.881 81.6 182.1 17 117.4 2009 205 231300 231400 78.00 16.01 113 0.211 104 0.608 104 10.408 81.6 182.1 17 117.4 2009 205 231400 231500 78.00 16.01 125 0.236 89 0.397 113 9.576 81.6 182.1 17 117.4 2009 205 231500 231600 78.00 16.01 113 0.242 108 0.417 108 9.813 81.6 182.1 17 117.4 2009 205 231600 231700 78.00 16.01 119 0.388 113 0.656 113 9.907 81.6 182.1 17 117.4 2009 205 231700 231800 78.00 16.01 113 0.309 113 0.386 113 9.821 81.6 182.1 17 117.4 2009 205 231800 231900 78.00 16.01 113 0.327 108 0.664 108 9.880 81.6 182.1 17 117.4 2009 205 231900 232000 78.00 16.01 113 0.226 113 0.361 113 9.729 81.6 182.1 17 117.4 2009 205 232000 232100 78.00 16.01 114 0.442 108 0.805 108 10.207 81.6 182.1 17 117.4 2009 205 232100 232200 78.00 16.01 113 0.276 104 0.585 113 9.783 81.6 182.1 17 117.4 2009 205 232200 232300 78.00 16.01 119 0.280 104 0.654 104 9.978 81.6 182.1 17 117.4 2009 205 232300 232400 78.00 16.01 125 0.283 104 0.431 104 9.821 81.6 182.1 17 117.4 2009 205 232400 232500 78.00 16.01 119 0.236 108 0.619 108 10.069 81.6 182.1 17 117.4 2009 205 232500 232600 78.00 16.01 114 0.226 104 0.428 104 10.070 81.6 182.1 17 117.4 2009 205 232600 232700 78.00 16.01 113 0.212 113 0.290 113 9.735 81.6 182.1 17 117.4 2009 205 232700 232800 78.00 16.01 119 0.289 108 0.580 108 9.867 81.6 182.1 17 117.4 2009 205 232800 232900 78.00 16.01 119 0.217 89 0.476 108 9.609 81.6 182.1 17 117.4 2009 205 232900 233000 78.00 16.01 119 0.252 104 0.403 104 9.909 81.6 182.1 17 117.4 2009 205 233000 233100 78.00 16.01 119 0.201 104 0.398 113 9.627 81.6 182.1 17 117.4 2009 205 233100 233200 78.00 16.01 119 0.284 104 0.494 104 9.835 81.6 182.1 17 117.4 2009 205 233200 233300 78.00 16.01 119 0.236 104 0.485 104 9.805 81.6 182.1 17 117.4 2009 205 233300 233400 78.00 16.01 119 0.286 108 0.780 108 10.135 81.6 182.1 17 117.4 2009 205 233400 233500 78.00 16.01 125 0.183 104 0.348 104 9.826 81.6 182.1 17 117.3 2009 205 233500 233600 78.00 16.01 119 0.177 89 0.350 119 9.662 81.6 182.1 17 117.3 2009 205 233600 233700 78.00 16.01 125 0.233 108 0.618 108 9.919 81.6 182.1 17 117.3 2009 205 233700 233800 78.00 16.01 119 0.156 104 0.310 104 9.966 81.6 182.1 17 117.3 2009 205 233800 233900 78.00 16.01 125 0.143 89 0.273 108 9.602 81.6 182.1 17 117.3 2009 205 233900 234000 78.00 16.01 125 0.165 104 0.392 104 9.952 81.6 182.1 17 117.3 2009 205 234000 234100 78.00 16.01 119 0.181 89 0.300 119 9.602 81.6 182.1 17 117.3 2009 205 234100 234200 78.00 16.01 119 0.190 93 0.370 119 9.625 81.6 182.1 17 117.3 2009 205 234200 234300 78.00 16.01 125 0.195 108 0.452 108 9.881 81.6 182.1 17 117.3 2009 205 234300 234400 78.00 16.01 119 0.215 93 0.620 93 10.042 81.6 182.1 17 117.3 2009 205 234400 234500 78.00 16.01 119 0.252 89 0.423 119 9.798 81.6 182.1 17 117.3 2009 205 234500 234600 78.00 16.01 125 0.287 104 0.277 125 9.783 81.6 182.1 17 117.3 2009 205 234600 234700 78.00 16.01 119 0.217 93 0.266 119 9.698 81.6 182.1 17 117.3 2009 205 234700 234800 78.00 16.01 119 0.207 108 0.473 108 9.779 81.6 182.1 17 117.2 2009 205 234800 234900 78.00 16.01 119 0.186 104 0.444 104 9.889 81.6 182.1 17 117.2 2009 205 234900 235000 78.00 16.01 119 0.212 114 0.468 114 9.710 81.6 182.1 17 117.2 2009 205 235000 235100 78.00 16.01 119 0.236 104 0.557 104 10.045 81.6 182.1 17 117.2 2009 205 235100 235200 78.00 16.01 113 0.209 108 0.492 108 9.971 81.6 182.1 17 117.2 2009 205 235200 235300 78.00 16.01 119 0.290 108 0.542 108 9.945 81.6 182.1 17 117.2 2009 205 235300 235400 78.00 16.01 119 0.253 93 0.644 93 9.771 81.6 182.1 17 117.2 2009 205 235400 235500 78.00 16.01 119 0.268 89 0.522 114 9.687 81.6 182.1 17 117.2 2009 205 235500 235600 78.00 16.01 113 0.308 113 0.656 113 9.900 81.6 182.1 17 117.2 2009 205 235600 235700 78.00 16.01 114 0.148 104 0.352 104 9.728 81.6 182.1 17 117.2 2009 205 235700 235800 78.00 16.01 113 0.214 113 0.481 113 9.723 81.6 182.1 17 117.1 2009 205 235800 235900 78.00 16.01 113 0.167 89 0.267 141 9.698 81.6 182.1 17 117.1 2009 205 235900 240000 78.00 16.01 114 0.202 89 0.382 114 9.683 81.6 182.1 17 117.1 2009 206 0 100 78.00 16.01 119 0.247 108 0.525 108 9.737 81.6 182.1 20 117.1