% year, date, start time (HHMMSS, UT), end time (HHMMSS, UT), % Geographic latitude (120 km alt), Geographic longitude (120 km alt), % Alt of max(Sig_P) [km], Height-integrated Sig_P [S], % Altitude of max(Sig_H) [km], Height-integrated Sig_H [S], % Altitude of maximum(Ne) [km], Maximum(Ne) [log(m^(-3))] % Elevation, Azimuth, Kp, and Solar zenith angle (SZA) % Magic constant = 1 2011 1115 100025 100500 69.36 19.16 120 3.221 115 1.797 142 10.604 77.5 186.2 23 88.4 2011 1115 100500 101000 69.36 19.16 120 3.882 115 2.028 142 10.591 77.5 186.2 23 88.3 2011 1115 101000 101500 69.36 19.16 120 4.092 115 2.397 142 10.648 77.5 186.2 23 88.3 2011 1115 101500 102000 69.36 19.16 120 3.597 95 2.663 134 10.610 77.5 186.2 23 88.3 2011 1115 102000 102500 69.36 19.16 120 3.893 95 2.840 142 10.604 77.5 186.2 23 88.3 2011 1115 102500 103000 69.36 19.16 120 4.079 91 2.780 142 10.600 77.5 186.2 23 88.3 2011 1115 103000 103500 69.36 19.16 120 4.044 95 2.888 127 10.573 77.5 186.2 23 88.3 2011 1115 103500 104000 69.36 19.16 120 4.101 92 2.998 142 10.636 77.5 186.2 23 88.3 2011 1115 104000 104500 69.36 19.16 120 4.175 92 2.940 134 10.640 77.5 186.2 23 88.3 2011 1115 104500 105000 69.36 19.16 120 4.132 92 2.674 127 10.618 77.5 186.2 23 88.3 2011 1115 105000 105500 69.36 19.16 120 4.290 95 2.736 127 10.637 77.5 186.2 23 88.3 2011 1115 105500 110000 69.36 19.16 120 4.806 92 2.943 134 10.633 77.5 186.2 23 88.4 2011 1115 110000 110500 69.36 19.16 120 4.528 95 2.431 134 10.598 77.5 186.2 23 88.4 2011 1115 110500 111000 69.36 19.16 120 4.585 98 2.412 142 10.609 77.5 186.2 23 88.5 2011 1115 111000 111500 69.36 19.16 120 4.084 115 2.270 142 10.558 77.5 186.2 23 88.6 2011 1115 111500 112000 69.36 19.16 120 4.356 115 2.485 127 10.544 77.5 186.2 23 88.7 2011 1115 112000 112500 69.36 19.16 120 4.287 115 2.443 142 10.565 77.5 186.2 23 88.7 2011 1115 112500 113000 69.36 19.16 120 4.303 95 2.510 142 10.570 77.5 186.2 23 88.8 2011 1115 113000 113500 69.36 19.16 120 4.309 98 2.406 142 10.606 77.5 186.2 23 89.0 2011 1115 113500 114000 69.36 19.16 120 4.020 115 2.265 142 10.548 77.5 186.2 23 89.1 2011 1115 114000 114500 69.36 19.16 120 4.194 98 2.079 142 10.554 77.5 186.2 23 89.2 2011 1115 114500 115000 69.36 19.16 120 4.400 98 2.155 142 10.568 77.5 186.2 23 89.3 2011 1115 115000 115500 69.36 19.16 120 4.028 95 2.282 142 10.567 77.5 186.2 23 89.5 2011 1115 115500 120000 69.36 19.16 120 3.872 98 2.084 142 10.545 77.5 186.2 23 89.6 2011 1115 120000 120500 69.36 19.16 127 3.660 98 1.794 142 10.542 77.5 186.2 20 89.8 2011 1115 120500 121000 69.36 19.16 120 3.634 98 1.746 142 10.515 77.5 186.2 20 89.9 2011 1115 121000 121500 69.36 19.16 127 3.262 98 1.622 142 10.501 77.5 186.2 20 90.1 2011 1115 121500 122000 69.36 19.16 126 2.880 98 1.523 134 10.485 77.5 186.2 20 90.3 2011 1115 122000 122500 69.36 19.16 120 3.106 98 1.396 134 10.439 77.5 186.2 20 90.5 2011 1115 122500 123000 69.36 19.16 127 3.043 101 1.334 142 10.446 77.5 186.2 20 90.7 2011 1115 123000 123500 69.36 19.16 127 2.767 101 1.100 134 10.390 77.5 186.2 20 90.9 2011 1115 123500 124000 69.36 19.16 127 2.732 101 1.084 142 10.407 77.5 186.2 20 91.1 2011 1115 124000 124500 69.36 19.16 126 2.795 101 1.032 142 10.417 77.5 186.2 20 91.3 2011 1115 124500 125000 69.36 19.16 127 2.726 104 0.995 142 10.393 77.5 186.2 20 91.6 2011 1115 125000 125500 69.36 19.16 127 2.548 98 0.962 142 10.353 77.5 186.2 20 91.8 2011 1115 125500 130000 69.36 19.16 126 2.263 98 0.935 142 10.297 77.5 186.2 20 92.0 2011 1115 130000 130500 69.36 19.16 127 2.336 104 0.759 142 10.277 77.5 186.2 20 92.3 2011 1115 130500 131000 69.36 19.16 127 2.226 115 0.682 142 10.298 77.5 186.2 20 92.5 2011 1115 131000 131500 69.36 19.16 120 2.031 95 0.921 142 10.289 77.5 186.2 20 92.8 2011 1115 131500 132000 69.36 19.16 127 1.722 98 0.932 142 10.236 77.5 186.2 20 93.1 2011 1115 132000 132500 69.36 19.16 120 1.655 98 1.343 142 10.236 77.5 186.2 20 93.4 2011 1115 132500 133000 69.36 19.16 120 1.628 98 1.320 142 10.258 77.5 186.2 20 93.6 2011 1115 133000 133500 69.36 19.16 127 1.656 101 1.255 142 10.336 77.5 186.2 20 93.9 2011 1115 133500 134000 69.36 19.16 76 1.836 76 1.557 142 10.352 77.5 186.2 20 94.2 2011 1115 134000 134500 69.36 19.16 120 2.788 115 2.684 120 10.663 77.5 186.2 20 94.5 2011 1115 134500 135000 69.36 19.16 120 4.081 110 5.153 110 10.964 77.5 186.2 20 94.9 2011 1115 135000 135500 69.36 19.16 120 4.232 110 4.788 115 10.990 77.5 186.2 20 95.2 2011 1115 135500 140000 69.36 19.16 120 3.666 115 3.228 120 10.921 77.5 186.2 20 95.5 2011 1115 140000 140200 69.36 19.16 120 3.111 115 2.575 127 10.846 77.5 186.2 20 95.8