Operation of optical instruments in Tromso
English page is here.
[before 2004]
[2005]
[2006]
[2007]
[2008]
[2009]
[2010]
[2011]
[2012]
[2013]
- May 9-12, 2013: GPS receivers and beacon receiver,
(Y. Otsuka and Y. Ogawa)
- March 5-10, 2013: A monochromatic EMCCD all-sky imager,
(Y. Tanaka, A. Kadokura, and Y. Ogawa)
- January 3-12, 2013: A monochromatic all-sky imager, AWI, and NWI
(Y. Ogawa, T. Sakanoi, and T. Ishida)
- December 14-20, 2012: AWI and NWI (Y. Ogawa)
- November 13-20, 2012: A monochromatic all-sky imager, AWI, and NWI
(Y. Ogawa)
- October 10-16: New GPS receivers, AWI, and NWI
(Y. Otsuka, Y. Ito, K. Hosokawa, and Y. Ogawa)
- March 28: Beacon, and termination of all optical measurements
(CDC, AWI, and NWI) (Y. Ogawa)
すべての光学観測の終了、データのバックアップ、Beacon受信観測用HDDの取り付け
- March 12 - 21: CDC, and ATV with EMCCD (H. Miyaoka)
EMCCDを用いた全天オーロラ観測のテスト
- January 25 - February 01: CDC (H. Miyaoka)
CDC用ルーター&UPSの設置、暗幕の取り付け
- January 18-25: GPS, Beacon, AWI, and NWI (Y. Otsuka and Y. Ogawa)
光学・電波観測用機器の配置の大幅変更
新GPS受信機の設置及び運用開始
ビーコン電波受信機の各種設定変更(アンプの交換等)
NWIカメラ群の設置及び運用開始
AWIカメラ群の設定変更
- December 9-11: WTV, AWI, NWI, NAC2 (Y. Ogawa)
WTVカメラとBRレコーダーを用いた記録システムの確立、
NWIカメラとNAC2カメラのフォーカス調整、
ビーコン受信機用PC内のデータバックアップ
- November 5-13: ATV, AWI, NWI, NAC2 (Y. Tanaka and Y. Ogawa)
ATV/WTVカメラの試験観測とBRレコーダーを用いた記録システムの構築、
AWI(RGB)カメラとNWIカメラ用記録システムの変更・調整、
NAC2カメラ観測用PCの交換の観測開始
- October 5-13: AWI, NWI, NAC2, Beacon receiver (Y. Ogawa)
AWI(RGB)カメラとNWIカメラの設置・調整、NAC2カメラの観測開始、
ビーコン受信機の観測開始、GPS3点観測のための現地調査と打ち合わせ
- September 27-29: CDC (H. Miyaoka)
CDCカメラの設置・調整
- March 24-25: Termination of all optical measurements
(Y. Ogawa)
すべての光学観測の観測終了とデータ収集、一部撤収等
- March 01-05: CDC, NTV and ATV (H. Miyaoka)
CDCカメラの調整やNTV及びATV自動観測のテスト
- January 02-06 and 11-13, 2011: NTV, NWI-G, AWI
(Y. Ogawa)
NTV自動観測のテスト、CDCカメラの交換やデータ収集等
- November 7-17, ATV, WTV, NWI-G, and AWI
(Y. Tanaka and Y. Ogawa)
NWI及びAWI自動観測の開始、ATV及びWTV観測との比較等
- October 6-17, ATV, NTV (Y. Ogawa)
ATV及びWTV観測、CDC自動観測の準備と調整・開始等
- March 11-20, 2010: ATV, WTV
(H. Miyaoka and Y. Ogawa)
ATV及びWTV観測、CDC自動観測の終了と撤収等
- January 11-20, 2010: ATV, WTV (Y. Ogawa)
ATV及びWTV観測、CDCカメラの交換と調整作業等
- December 14-19, 2009: ATV, WTV (H. Miyaoka)
ATV及びWTVの自動観測自動観測のための調整作業等
- November 11-24, 2009: ATV, WTV (Y. Ogawa)
ATV及びWTV手動運用と今後の自動観測のための調整作業、
CDCカメラの調整作業等
- October 24-25, 2009: ATV (H. Miyaoka)
ATV自動観測のための調整作業等
- January 14-28, 2009: ATV, WTV (Y. Ogawa)
ATV及びWTV手動運用、CDCカメラの調整作業、GPS受信機の交換等
- December 16-20, 2008: CDC, ATV, WTV (Y. Ogawa)
(We started a semi-automatic CDC observation on December 18, 2008.)
ATV及びWTVの手動運用、CDCカメラの設置と自動観測のための調整作業等
- October 27-November 09, 2008: CDC, ATV, WTV
(Y, Tanaka and Y. Ogawa)
ATV及びWTV、CDCカメラの手動運用等
- September 27- October 01, 2008: CDC, ATV, WTV
(H. Miyaoka)
ATV及びWTV、CDCカメラの手動運用等
- March 03-13, 2008: CDC, ATV, WTV
(K. Hosokawa, and Y. Ogawa)
ATV及びWTV、CDCカメラの手動運用、GPSアンテナ&受信機の設置等
- December 06-16, 2007: CDC, ATV, WTV
(T. Tsuda, and Y. Iwata)
ATV及びWTV、CDCカメラの手動運用等
- November 06-22, 2007: CDC, ATV, WTV
(Y. Kurihara (Koizumi), and Y. Ogawa)
ATV及びWTV、CDCカメラの手動運用等
- October 10-17, 2007: CDC, ATV, WTV (T. Tsuda)
ATV及びWTV、CDCカメラの手動運用等
- September 20-21, 2007: CDC, ATV
(A. Kadokura, K. Hosokawa, and Y. Ogawa)
ATV及びWTVカメラシステムの設置と調整等
- February 13 - March 06, 2007: CDC
(Y. Ogawa and H. Handa)
- January 17-18, 2007: CDC (S. Nozawa)
CDCカメラの手動運用
- December 07-13, 2006 CDC
(S. Nozawa, and T. Tsuda)
CDCカメラの手動運用
- November 14-25, 2006: CDC (Y. Ogawa)
CDCカメラの手動運用
- October 16-18, 2006: CDC (S. Nozawa, and T. Tsuda)
CDCカメラの手動運用
- October 27 - November 09, 2005: CDC
(Y. Ogawa, K. Adachi, and H. Handa)
CDCカメラの手動運用
- September, 2005: CDC
CDCカメラの手動運用
- 2003 - December 16, 2004: CDC, NAC, etc.
(H. Miyaoka)
CDC: All-sky digital color camera
NAC: Narrow field-of-view auroral camera
ATV: All-sky TV imager
WTV: Wide field-of-view TV imager
AWI: All-sky WATEC imager
NWI: Narrow field-of-view WATEC imager